Building Published 05/18/2026. 43 classifications. Covers 1 county: Perry
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 40.00 | 29.81 | 69.81 |
| BOILERMAKER | 55.00 | 35.48 | 90.48 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | 33.99 | 16.87 | 50.86 |
| CARPENTER (INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, FORM WORK AND SCAFFOLD BUILDING) | 36.84 | 20.19 | 57.03 |
| MILLWRIGHT | 43.00 | 23.44 | 66.44 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, HVAC/TEMPERATURE CONTROLS INSTALLATION, AND LOW VOLTAGE WIRING) | 40.00 | 27.42 | 67.42 |
| ELEVATOR MECHANIC FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE AS VACATION PAY CREDIT, AND 6% OF BASIC HOURLY RATE FOR LESS THAN 5 YEARS OF SERVICE B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | 58.70 | 38.44 | 97.14 |
| POWER EQUIPMENT OPERATOR (PUMP) | 32.25 | 21.32 | 53.57 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | 36.87 | 21.32 | 58.19 |
| POWER EQUIPMENT OPERATOR: CRANE | 47.14 | 31.58 | 78.72 |
| POWER EQUIPMENT OPERATOR (OILER) | 39.42 | 29.30 | 68.72 |
| POWER EQUIPMENT OPERATOR (HOIST (WITH TWO TOWERS), FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK)) | 44.61 | 30.83 | 75.44 |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | 41.88 | 30.03 | 71.91 |
| IRONWORKER, STRUCTURAL, REINFORCING AND ORNAMENTAL | 37.26 | 32.63 | 69.89 |
| LABORER: CONCRETE WORKER | 24.61 | 17.18 | 41.79 |
| LABORER (MASON TENDER- BRICK) | 26.91 | 17.18 | 44.09 |
| PAINTER: BRUSH AND ROLLER ONLY | 25.84 | 16.30 | 42.14 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | 43.35 | 29.56 | 72.91 |
| PLUMBER (INCLUDES HVAC PIPE INSTALLATION, EXLUDES HVAC UNIT INSTALLATION) | 43.35 | 29.56 | 72.91 |
| ROOFER (EXCLUDES WATERPROOFING) | 40.33 | 32.62 | 72.95 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 49.75 | 28.96 | 78.71 |
| SHEET METAL WORKER: HVAC DUCT INSTALLATION ONLY FOOTNOTE: PAID HOLIDAY: ELECTION DAY | 45.02 | 44.09 | 89.11 |
| TRUCK DRIVER: DUMP TRUCK | 20.86 | 4.84 | 25.70 |
| TILE SETTER | 24.30 | 11.79 | 36.09 |
| TILE FINISHER | 20.70 | 8.51 | 29.21 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 28.66 25.92 ROOFER: WATERPROOFING ONLY | 28.60 | 18.02 | 46.62 |
| PLUMBER (HVAC UNIT INSTALLATION ONLY) | 27.02 | 13.02 | 40.04 |
| PAINTER: SPRAY ONLY | 27.89 | 13.53 | 41.42 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 30.39 | 15.05 | 45.44 |
| OPERATOR: LOADER | 27.05 | 14.52 | 41.57 |
| OPERATOR: HYDRO MULCH | 26.41 | 16.58 | 42.99 |
| OPERATOR: GRADER/BLADE | 32.51 | 17.98 | 50.49 |
| OPERATOR: GRADALL | 32.70 | 18.43 | 51.13 |
| OPERATOR: DRILL | 27.43 | 16.94 | 44.37 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 26.41 | 16.58 | 42.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 38.35 | 18.48 | 56.83 |
| LABORER: FORKLIFT (MASONRY WORK ONLY) | 24.31 | 8.49 | 32.80 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 17.89 | 8.28 | 26.17 |
| LABORER: COMMON/GENERAL, INCLUDING LANDSCAPING | 20.19 | 8.45 | 28.64 |
| GLAZIER | 25.05 | 8.58 | 33.63 |
| FLOOR LAYER: CARPET ONLY | 25.71 | 12.02 | 37.73 |
| CEMENT MASON/CONCRETE FINISHER | 23.69 | 16.56 | 40.25 |
| OPERATOR: BULLDOZER | 37.85 | 22.72 | 60.57 |