Building Published 05/18/2026. 34 classifications. Covers 1 county: Monroe
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 39.18 | 26.07 | 65.25 |
| BOILERMAKER | 55.00 | 35.48 | 90.48 |
| TILE SETTER | 32.92 | 19.31 | 52.23 |
| TILE FINISHER | 30.20 | 16.41 | 46.61 |
| CARPENTER (INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, AND FORM WORK) | 36.57 | 20.04 | 56.61 |
| ELECTRICIAN (EXCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, HVAC/TEMPERATURE CONTROL INSTALLATION AND LOW VOLTAGE WIRING) | 65.43 | 42.20 | 107.63 |
| ELEVATOR MECHANIC FOOTNOTES: A. VACATION CREDIT: EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE AS VACATION PAY CREDIT, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | 61.41 | 38.44 | 99.85 |
| POWER EQUIPMENT OPERATOR (PUMP) | 28.36 | 18.10 | 46.46 |
| POWER EQUIPMENT OPERATOR (OILER) | 39.42 | 29.30 | 68.72 |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT, EXCLUDES MASONRY WORK)) | 41.88 | 30.03 | 71.91 |
| POWER EQUIPMENT OPERATOR (BACKHOE/ EXCAVATOR/ TRACKHOE, BOBCAT/ SKID/ STEER/ SKID LOADER, BULLDOZER, HOIST (WITH TWO TOWERS), MECHANIC, LOADER, FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK)) | 44.61 | 30.83 | 75.44 |
| IRONWORKER (ORNAMENTAL, STRUCTURAL, REINFORCING, & RIGGER) | 37.26 | 32.63 | 69.89 |
| LABORER: MASON TENDER-BRICK | 26.74 | 17.34 | 44.08 |
| LABORER (COMMON OR GENERAL; CONCRETE WORKER; TAMPER (HAND HELD)) | 25.39 | 17.34 | 42.73 |
| PAINTER (BRUSH, ROLLER, SPRAY, AND DRYWALL FINISHING/TAPING) | 27.95 | 16.12 | 44.07 |
| PLUMBER | 51.69 | 27.07 | 78.76 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | 51.69 | 27.07 | 78.76 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 49.75 | 30.26 | 80.01 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND METAL ROOF INSTALLATION) | 36.13 | 30.32 | 66.45 |
| TRUCK DRIVER: DUMP TRUCK | 23.36 | 7.60 | 30.96 |
| ROOFER: WATERPROOFING ONLY | 28.60 | 18.02 | 46.62 |
| ROOFER, EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING | 26.56 | 17.98 | 44.54 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 33.01 | 18.37 | 51.38 |
| OPERATOR: GRADER/BLADE | 32.51 | 17.98 | 50.49 |
| OPERATOR: GRADALL | 32.70 | 18.43 | 51.13 |
| OPERATOR: DRILL | 28.55 | 15.78 | 44.33 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | 48.28 | 24.74 | 73.02 |
| ELECTRICIAN (INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS ONLY) | 48.28 | 24.74 | 73.02 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | 48.28 | 24.74 | 73.02 |
| CEMENT MASON/CONCRETE FINISHER | 24.97 | 16.60 | 41.57 |
| BRICKLAYER | 30.34 | 13.97 | 44.31 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 27.89 | 19.81 | 47.70 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | 55.63 | 30.87 | 86.50 |
| OPERATOR: CRANE | 44.13 | 29.82 | 73.95 |