Building Published 08/20/2026. 34 classifications. Covers 1 county: Cambria
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 40.00 | 29.81 | 69.81 |
| BOILERMAKER | 48.28 | 33.17 | 81.45 |
| TILE FINISHER | 28.76 | 17.16 | 45.92 |
| TILE SETTER | 35.64 | 21.63 | 57.27 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, CLEANING).$ 34.14 22.00 MASON - STONE | 34.14 | 22.00 | 56.14 |
| CARPENTER (SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD ONLY) | 33.01 | 18.09 | 51.10 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-CARPET AND VINYL, FORM WORK AND GUTTER INSTALLATION; EXCLUDES SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD FLOORS.) | 33.01 | 18.09 | 51.10 |
| MILLWRIGHT | 43.00 | 23.44 | 66.44 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND LOW VOLTAGE WIRING; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION) | 49.11 | 36.79 | 85.90 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, CRANE* LOADER, MECHANIC) *ADD TO CRANE RATE BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | 36.87 | 21.32 | 58.19 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 36.87 | 21.32 | 58.19 |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP | 29.70 | 21.32 | 51.02 |
| POWER EQUIPMENT OPERATOR: OILER | 29.70 | 21.32 | 51.02 |
| POWER EQUIPMENT OPERATOR: ROLLER | 32.25 | 21.32 | 53.57 |
| IRONWORKER (ORNAMENTAL, REINFORCING, RIGGER, STRUCTURAL) | 38.89 | 34.54 | 73.43 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | 30.24 | 12.05 | 42.29 |
| LABORER: MASON TENDER-BRICK | 29.56 | 17.05 | 46.61 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | 32.39 | 23.26 | 55.65 |
| PAINTER: BRUSH, ROLLER, AND SPRAY ONLY | 30.56 | 23.72 | 54.28 |
| GLAZIER | 25.40 | 25.47 | 50.87 |
| CEMENT MASON/CONCRETE FINISHER | 31.77 | 21.89 | 53.66 |
| PLASTERER | 29.20 | 12.86 | 42.06 |
| PLUMBER (INDUSTRIAL) | 47.75 | 26.55 | 74.30 |
| PIPEFITTER | 41.36 | 29.45 | 70.81 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 46.75 | 35.93 | 82.68 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | 34.86 | 18.55 | 53.41 |
| LABORER: COMMON OR GENERAL | 17.53 | 10.02 | 27.55 |
| OPERATOR: FORKLIFT, ALL TYPES | 23.69 | 13.13 | 36.82 |
| PLUMBER (HVAC PIPE INSTALLATION ONLY) | 30.44 | 18.73 | 49.17 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION AND WORK ON INDUSTRIAL SITES | 30.14 | 18.83 | 48.97 |
| ROOFER, EXCLUDES WATERPROOFING | 33.50 | 20.66 | 54.16 |
| ROOFER: WATERPROOFING ONLY | 29.50 | 21.10 | 50.60 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 31.38 19.73 TRUCK DRIVER: DUMP TRUCK | 23.36 | 7.60 | 30.96 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 47.42 | 28.21 | 75.63 |