Building Published 08/20/2026. 35 classifications. Covers 1 county: Armstrong
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION AND INDUSTRIAL WORK (INCLUDING DUCT AND PIPE)) | 46.50 | 29.43 | 75.93 |
| BOILERMAKER | 48.28 | 33.17 | 81.45 |
| TILE FINISHER | 28.76 | 17.16 | 45.92 |
| TILE SETTER | 35.64 | 21.63 | 57.27 |
| BRICKLAYER: INCLUDING POINTING, CAULKING, CLEANING AND BRICK REFRACTORY WORK ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | 36.55 | 24.46 | 61.01 |
| MASON - STONE ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | 36.55 | 24.46 | 61.01 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-HARDWOOD, CARPET AND VINYL; FORM WORK, AND SCAFFOLD BUILDING) | 38.92 | 20.06 | 58.98 |
| PILEDRIVERMAN | 43.13 | 23.42 | 66.55 |
| MILLWRIGHT | 43.00 | 23.44 | 66.44 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM, LOW VOLTAGE WIRING AND HVAC TEMPERATURE CONTROL INSTALLATION) | 49.11 | 36.79 | 85.90 |
| POWER EQUIPMENT OPERATOR: COMPRESSOR, CONCRETE PUMP, FORKLIFT (RIDDEN OR SELF-PROPELLED), HIGHLIFT, HOIST, ROLLER, TUGBOAT OPERATOR | 35.62 | 24.05 | 59.67 |
| POWER EQUIPMENT OPERATOR: LOADER | 41.69 | 24.05 | 65.74 |
| IRONWORKER (METAL ROOF INSTALLATION, ORNAMENTAL, REINFORCING, RIGGER AND STRUCTURAL; METAL BUILDINGS: METAL SIDING/WALL PANELS INSTALLATION) | 38.89 | 34.54 | 73.43 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | 30.24 | 12.05 | 42.29 |
| LABORER (ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, AND CEILINGS)) | 27.97 | 20.39 | 48.36 |
| PAINTER (BRUSH, ROLLER, AND SPRAY, EXCLUDING WORK ON INDUSTRIAL SITES) | 30.56 | 23.72 | 54.28 |
| PAINTER: DRYWALL FINISHING/TAPING | 32.39 | 23.26 | 55.65 |
| PAINTER (INDUSTRIAL: BRUSH AND ROLLER ONLY) | 36.01 | 23.72 | 59.73 |
| PAINTER (INDUSTRIAL: SPRAY AND SANDBLASTER ONLY) | 36.01 | 23.72 | 59.73 |
| GLAZIER | 35.65 | 29.73 | 65.38 |
| CEMENT MASON/CONCRETE FINISHER | 31.77 | 21.89 | 53.66 |
| PLASTERER | 30.69 | 18.99 | 49.68 |
| PLUMBER | 48.65 | 25.47 | 74.12 |
| PIPEFITTER (INDUSTRIAL) | 52.50 | 30.17 | 82.67 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION, EXCLUDES WORK ON INDUSTRIAL SITES) | 48.15 | 29.17 | 77.32 |
| ROOFER (INCLUDES WATERPROOFING, EXCLUDES METAL ROOF INSTALLATION) | 41.21 | 21.46 | 62.67 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 45.08 | 26.16 | 71.24 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | 46.75 | 35.93 | 82.68 |
| LABORER: ASPHALT RAKER | 20.92 | 9.09 | 30.01 |
| LABORER: COMMON OR GENERAL | 20.92 | 9.09 | 30.01 |
| LABORER: LANDSCAPE | 18.10 | — | 18.10 |
| LABORER: LUTEMAN | 21.13 | 8.23 | 29.36 |
| LABORER: MASON TENDER - BRICK | 20.92 | 9.72 | 30.64 |
| OPERATOR: BROOM/SWEEPER | 24.83 | 14.13 | 38.96 |
| TRUCK DRIVER: DUMP TRUCK | 23.36 | 7.60 | 30.96 |