Building Published 05/18/2026. 31 classifications. Covers 1 county: Payne
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 33.70 | 24.41 | 58.11 |
| BRICKLAYER | 26.92 | 13.09 | 40.01 |
| CARPENTER (EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | 27.79 | 10.05 | 37.84 |
| ELECTRICIAN | 41.40 | 13.14 | 54.54 |
| ELECTRICIAN (LOW VOLTAGE WIRING AND ALARM INSTALLATION ONLY) | 24.26 | 9.76 | 34.02 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | 28.77 | 19.05 | 47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | 34.07 | 19.05 | 53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | 35.40 | 19.05 | 54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | 36.14 | 19.05 | 55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | 27.25 | 19.05 | 46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | 38.09 | 19.05 | 57.14 |
| IRONWORKER, STRUCTURAL | 32.10 | 17.38 | 49.48 |
| PLASTERER | 33.62 | 14.18 | 47.80 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | 41.00 | 16.03 | 57.03 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | 41.00 | 16.03 | 57.03 |
| SHEET METAL WORKER (HVAC DUCT AND UNIT INSTALLATION ONLY) | 33.38 | 16.36 | 49.74 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | 16.32 | — | 16.32 |
| ROOFER | 15.00 | 0.29 | 15.29 |
| PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | 19.00 | — | 19.00 |
| PAINTER: DRYWALL FINISHING/TAPING | 11.90 | — | 11.90 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 13.38 | — | 13.38 |
| OPERATOR: ROLLER | 13.80 | 0.94 | 14.74 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 19.34 | 0.74 | 20.08 |
| LABORER: PLASTER TENDER | 10.17 | — | 10.17 |
| LABORER: PIPELAYER | 13.03 | — | 13.03 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 13.04 | — | 13.04 |
| LABORER: MASON TENDER - BRICK | 11.88 | — | 11.88 |
| LABORER: COMMON OR GENERAL | 9.00 | — | 9.00 |
| CEMENT MASON/CONCRETE FINISHER | 16.10 | — | 16.10 |
| CARPENTER (FORM WORK ONLY) | 15.34 | 5.50 | 20.84 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | 14.16 | — | 14.16 |