Building Published 05/18/2026. 38 classifications. Covers 1 county: Summit
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 43.88 | 26.93 | 70.81 |
| BRICK POINTER/CAULKER/CLEANER | 36.89 | 22.13 | 59.02 |
| BRICKLAYER | 36.89 | 22.13 | 59.02 |
| TILE FINISHER | 25.37 | 17.42 | 42.79 |
| TILE SETTER | 33.23 | 15.47 | 48.70 |
| CARPENTER (INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, AND FORM WORK) | 36.29 | 23.79 | 60.08 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | 46.63 | 24.92 | 71.55 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS) | 42.55 | 23.18 | 65.73 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | 29.23 | 16.36 | 45.59 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | 60.52 | 38.44 | 98.96 |
| POWER EQUIPMENT OPERATOR: CRANE | 46.71 | 16.41 | 63.12 |
| POWER EQUIPMENT OPERATOR (OILER) | 36.93 | 16.41 | 53.34 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE | 45.63 | 16.41 | 62.04 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | 32.42 | 19.66 | 52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 28.87 | 19.66 | 48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | 32.92 | 19.66 | 52.58 |
| IRONWORKER (ORNAMENTAL, REINFORCING, & STRUCTURAL) | 36.83 | 29.01 | 65.84 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | 31.89 | 22.66 | 54.55 |
| LABORER: PIPELAYER | 35.12 | 12.65 | 47.77 |
| LABORER: MASON TENDER - BRICK | 35.07 | 12.65 | 47.72 |
| LABORER: COMMON OR GENERAL | 34.92 | 12.65 | 47.57 |
| GLAZIER | 32.87 | 15.17 | 48.04 |
| PLASTERER | 29.51 | 15.67 | 45.18 |
| CEMENT MASON/CONCRETE FINISHER | 33.48 | 24.81 | 58.29 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | 49.17 | 28.55 | 77.72 |
| ROOFER | 40.15 | 21.28 | 61.43 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 37.66 | 32.23 | 69.89 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) | 38.36 | 29.59 | 67.95 |
| TRUCK DRIVER: DUMP (ALL TYPES) | 24.32 | 11.73 | 36.05 |
| PLUMBER | 27.79 | 14.49 | 42.28 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | 35.12 | — | 35.12 |
| PAINTER: SPRAY | 22.78 | 12.40 | 35.18 |
| PAINTER (BRUSH AND ROLLER) | 20.55 | 1.88 | 22.43 |
| OPERATOR: ROLLER | 31.48 | 12.80 | 44.28 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 31.48 | 12.80 | 44.28 |
| OPERATOR: LOADER | 29.66 | 12.61 | 42.27 |
| OPERATOR: BULLDOZER | 29.23 | 12.76 | 41.99 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 32.30 | 10.80 | 43.10 |