Building Published 05/18/2026. 37 classifications. Covers 1 county: Greene
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 35.23 | 23.04 | 58.27 |
| BRICKLAYER | 33.30 | 18.28 | 51.58 |
| TILE SETTER | 30.98 | 15.82 | 46.80 |
| TILE FINISHER | 28.28 | 11.05 | 39.33 |
| CARPENTER | 30.96 | 18.44 | 49.40 |
| ELECTRICIAN | 38.00 | 22.49 | 60.49 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | 57.41 | 38.44 | 95.85 |
| POWER EQUIPMENT OPERATOR: CRANE | 44.14 | 16.41 | 60.55 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | 32.42 | 19.66 | 52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 28.87 | 19.66 | 48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | 32.92 | 19.66 | 52.58 |
| IRONWORKER: ORNAMENTAL | 37.77 | 23.90 | 61.67 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | 37.39 | 25.35 | 62.74 |
| LABORER: MASON TENDER - BRICK | 27.30 | 18.75 | 46.05 |
| LABORER: COMMON OR GENERAL; ASBESTOS ABATEMENT (REMOVAL FROM CEILINGS, FLOORS, AND WALLS) | 31.65 | 12.95 | 44.60 |
| PAINTER: BRUSH AND ROLLER | 29.15 | 13.97 | 43.12 |
| GLAZIER | 31.95 | 18.20 | 50.15 |
| CEMENT MASON/CONCRETE FINISHER | 32.71 | 19.27 | 51.98 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | 51.00 | 32.56 | 83.56 |
| PLUMBER (INCLUDES HVAC PIPE INSTALLATION) | 43.05 | 27.18 | 70.23 |
| ROOFER | 34.38 | 19.94 | 54.32 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 48.28 | 28.08 | 76.36 |
| TRUCK DRIVER: DUMP (ALL TYPES) | 22.08 | 11.51 | 33.59 |
| SHEET METAL WORKER (HVAC DUCT AND HVAC UNIT INSTALLATION ONLY) | 26.41 | 17.34 | 43.75 |
| PAINTER: SPRAY | 22.78 | 12.40 | 35.18 |
| OPERATOR: ROLLER | 28.25 | 12.61 | 40.86 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 30.28 | 13.29 | 43.57 |
| OPERATOR: LOADER | 29.99 | 12.80 | 42.79 |
| OPERATOR: BULLDOZER | 26.01 | 4.95 | 30.96 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 30.26 | 12.58 | 42.84 |
| LABORER: PIPELAYER | 23.98 | 8.58 | 32.56 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 22.95 | 8.60 | 31.55 |
| FORM WORKER | 22.41 | 9.01 | 31.42 |
| DRYWALL HANGER AND METAL STUD INSTALLER | 21.02 | 4.21 | 25.23 |
| OPERATOR: OILER | 27.56 | 16.37 | 43.93 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | 28.10 | 23.41 | 51.51 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 34.84 | 14.76 | 49.60 |