Building Published 05/18/2026. 26 classifications. Covers 1 county: Chautauqua
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | 38.34 | 20.51 | 58.85 |
| BRICKLAYER | 37.88 | 24.10 | 61.98 |
| CEMENT MASON/CONCRETE FINISHER | 32.53 | 22.10 | 54.63 |
| SOFT FLOOR LAYER | 25.61 | 17.40 | 43.01 |
| CARPENTER (INCLUDES DRYWALL HANGING AND FORM WORK (EXCLUDES ACOUSTICAL CEILING INSTALLATION AND METAL STUD INSTALLATION)) | 30.65 | 21.52 | 52.17 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | 42.50 | 27.23 | 69.73 |
| POWER EQUIPMENT OPERATOR: CRANE | 44.23 | 35.40 | 79.63 |
| IRONWORKER: ORNAMENTAL | 35.49 | 32.30 | 67.79 |
| IRONWORKER, STRUCTURAL | 35.49 | 32.30 | 67.79 |
| IRONWORKER, REINFORCING | 35.49 | 32.30 | 67.79 |
| LABORER (COMMON OR GENERAL) | 27.68 | 22.14 | 49.82 |
| PAINTER (SPRAY) | 28.35 | 25.21 | 53.56 |
| PAINTER: BRUSH AND ROLLER | 27.25 | 25.24 | 52.49 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | 42.20 | 29.80 | 72.00 |
| PLUMBER | 42.20 | 29.80 | 72.00 |
| ROOFER | 36.70 | 18.00 | 54.70 |
| PAINTER: DRYWALL FINISHING/TAPING | 24.81 | 21.13 | 45.94 |
| OPERATOR: FORKLIFT | 32.70 | 24.12 | 56.82 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 41.10 | 19.26 | 60.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 43.97 | 24.17 | 68.14 |
| MILLWRIGHT | 27.08 | 19.72 | 46.80 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 23.84 | 14.18 | 38.02 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 31.50 | 21.11 | 52.61 |
| INSTALLER: METAL STUDS | 26.70 | 17.40 | 44.10 |
| GLAZIER | 25.03 | 19.70 | 44.73 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 26.00 | 18.35 | 44.35 |