Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

NY20260013 rev 2

Building  Published 05/18/2026. 26 classifications. Covers 1 county: Oneida

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
MARBLE, TILE & TERRAZZO WORKERS (UTICA CHAPTER)35.8520.3756.22
MARBLE, TILE & TERRAZZO FINISHER (UTICA CHAPTER)28.5219.5948.11
BRICKLAYER: BRICKLAYERS, STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CLEANERS & CAULKERS (UTICA CHAPTER)39.2422.0261.26
CARPENTER: PILEDRIVER32.6421.9754.61
CARPENTER (CARPENTERS, MILLWRIGHTS)32.6421.9754.61
ELECTRICIAN50.5035.0385.53
CABLE SPLICER55.5535.0390.58
ELEVATOR CONSTRUCTOR FOOTNOTE: A.VACATION 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY57.7338.4496.17
POWER EQUIPMENT OPERATOR LOADER, ROLLER FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE THE HOLIDAY AND THE WORKING DAY AFTER THE HOLIDAY CRANE PREMIUMS (ADD TO GROUP 1 RATE): BOOM LENGTH INCL. JIB OVER 150 PLUS $1.75 BOOM LENGTH INCL. JIB OVER 200 FT PLUS $2.75 BOOM LENGTH INCL. JIB OVER 300 FT PLUS $3.7548.1131.8579.96
POWER EQUIPMENT OPERATOR CRANE FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE THE HOLIDAY AND THE WORKING DAY AFTER THE HOLIDAY CRANE PREMIUMS (ADD TO GROUP 1 RATE): BOOM LENGTH INCL. JIB OVER 150 PLUS $1.75 BOOM LENGTH INCL. JIB OVER 200 FT PLUS $2.75 BOOM LENGTH INCL. JIB OVER 300 FT PLUS $3.7549.6131.8581.46
BOOM LENGTH INCL. JIB OVER 150 PLUS $1.75 BOOM LENGTH INCL. JIB OVER 200 FT PLUS $2.75 BOOM LENGTH INCL. JIB OVER 300 FT PLUS $3.7545.9931.8577.84
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (REMANINDER OF COUNTY)35.5031.3966.89
LABORERS:, HAZARDOUS WASTE REMOVAL ((HAZARDOUS WASTE REMOVAL INCLUDES, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS))24.0020.6444.64
LABORERS: (WAGON DRILL OPERATOR)22.9020.6443.54
LABORERS: (PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND), POWER LIFT (WALK BEHIND) WAGON DRILL OPERATOR)22.6520.6443.29
LABORERS: (LABORERS)22.5020.6443.14
LABORERS: (BLASTERS, FORM SETTERS, MOTOR-BUGGY OPERATOR (RYDER TYPE))23.0020.6443.64
LABORERS: (ASBESTOS REMOVAL)24.0020.6444.64
PAINTERS: (SPRAY/SANDBLASTING/STRUCTURAL STEEL)28.8226.8855.70
PAINTERS: (BRUSH & ROLLER, DRYWALL TAPING/FINISHING)28.3226.8855.20
GLAZIER30.0027.5957.59
PLUMBER, INCLUDING STEAMFITTING (NORTHERN ZONE)45.9333.7779.70
ROOFER35.8025.9961.79
SPRINKLER FITTER47.8528.9476.79
SHEET METAL WORKER (PROJECTS OVER $10 MILLION)46.2923.3169.60
SHEET METAL WORKER (PROJECTS 10 MILLION OR LESS)36.2923.3159.60
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.