BuildingHeavyHighway Published 06/01/2026. 50 classifications. Covers 3 counties: Clark, Lincoln, Nye
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS/INSULATOR WORKER: MECHANIC (ZONE PAY (0-19 MILES, LAS VEGAS): $0.00 ZONE PAY (20-45 MILES): $4.00 ZONE PAY (46-75 MILES, MERCURY) $5.00 ZONE PAY (76-150 MILES, FORWARD AREAS) $7.00 ZONE PAY (150+ MILES, NTTR): $8.00) | 67.19 | 19.88 | 87.07 |
| BOILERMAKER: BLACKSMITH ZONE PAY (ZONE A - LAS VEGAS $0.00 ZONE B - MERCURY & FORWARD AREAS $2.00 ZONE C - NTTR $2.50) | 44.31 | 28.96 | 73.27 |
| TILE FINISHER (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | 37.07 | 14.74 | 51.81 |
| TILE SETTER (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | 49.74 | 18.79 | 68.53 |
| TERRAZZO WORKER/SETTER (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | 52.44 | 18.79 | 71.23 |
| MARBLE SETTER (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | 52.44 | 18.79 | 71.23 |
| CAULKER (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | 52.79 | 20.89 | 73.68 |
| BRICKLAYER (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | 52.79 | 20.89 | 73.68 |
| MILLWRIGHT (ZONE PAY: ZONE A: LAS VEGAS- FREE ZONE ZONE B: MERCURY, FORWARD & NTTR AREAS-$4.25) | 54.16 | 27.84 | 82.00 |
| CARPENTER (ZONE PAY: ZONE A: LAS VEGAS - FREE ZONE ZONE B: MERCURY, FORWARD & NTTR AREAS - $4.25) | 52.12 | 28.08 | 80.20 |
| ELECTRICIAN: CABLE SPLICER (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | 61.22 | 28.70 | 89.92 |
| ELECTRICIAN: COMMUNICATION TECHNICIAN ONLY (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | 64.37 | 28.81 | 93.18 |
| ELECTRICIAN (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | 64.37 | 28.81 | 93.18 |
| LINE CONSTRUCTION: LINEMAN (ZONE PAY -NNSS $5.00; NTTR $5.00) | 62.08 | 31.99 | 94.07 |
| LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR (ZONE PAY -NNSS $5.00; NTTR $5.00) | 62.08 | 31.99 | 94.07 |
| LINE CONSTRUCTION: GROUNDMAN (ZONE PAY -NNSS $5.00; NTTR $5.00) | 49.66 | 31.50 | 81.16 |
| ELEVATOR MACHANIC (ZONE PAY: ZONE A- LAS VEGAS ZONE B-MERCURY $2.00. ZONE C- NTTR $2.50. FOOTNOTE ADDITIONAL FRINGE BENEFITS TO BE PAID A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 0 MONTHS TO 5 YEARS OF SERVICE. B: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY.) | 69.43 | 38.44 | 107.87 |
| POWER EQUIPMENT OPERATOR GROUP 9 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; RUBBER-TIRED ANYTANDEM, MULTIPLE ENGINE EARTH-MOVING EQUIPMENT OPERATOR (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | 58.74 | 34.00 | 92.74 |
| POWER EQUIPMENT OPERATOR GROUP 8 EXCAVATOR/TRACKHOE OR SIMILAR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | 58.92 | 34.00 | 92.92 |
| POWER EQUIPMENT OPERATOR GROUP 7 HEAVY DUTY REPAIRMAN; HEAVY DUTY WELDER; LIGHT DUTY REPAIRMAN (HYBRID/ALL ELECTRIC). (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | 57.99 | 34.00 | 91.99 |
| HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR; JUMBO PIPE CARRIER; KOLMAN BELT LOADER, AND SIMILAR TYPE; LIFT SLAB MACHINE OPERATOR; LOADER OPERATOR; MACHINIST OPERATOR; MICRO TUNNEL SYSTEM (BELOW GROUND); MOTOR PATROL OPERATOR (ANY TYPE OR SIZE); OZZIE PADDER (OR SIMILAR TYPE); PNEUMATIC CONCRETE PLACING MACHINE OPERATOR (OR SIMILAR TYPE); PNEUMATIC PIPE RAMMING TOOL (AND SIMILAR TYPES); ROTOMIL OPERATOR; SEWER PLANT OPERATOR; SHOVEL, CRANE, BACKHOE, DRAGLINE, CLAMSHELL; DERRICK, DERRICK BARGE, PILE DRIVER, AND MUCKING MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER (WHEEL TYPE OVER 1 1/2 YARDS); SURFACE HEATER AND PLANER OPERATOR; TRACTOR LOADER OPERATOR, (CRAWLER TYPE- ALL TYPES AND SIZES); TRACTOR OPERATOR (WITH BOOM ATTACHMENTS); TRAVELING PIPE WRAPPING, CLEANING AND BENDING MACHINE OPERATOR; TRENCHING MACHINE OPERATOR (OVER 6-FT DEPTH); TUNNEL BORING MACHINE; WATER PULL (COMPACTION); WATER WELL DRILLER. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | 57.74 | 34.00 | 91.74 |
| POWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR-ROLLER (ALL TYPES AND SIZES), SOIL CEMENT, ASPHALT FINISH; ASPHALT PLANT ENGINEER; DECK ENGINE OPERATOOR; GRADE CHECKER; PAVEMENT-BREAKER OPERATOR; PNEUMATIC HEADING SHIELD- TUNNEL; ROAD OIL MIXING MACHINE OPEREATOR; FORKLIFT (UNDER (5) TONS); RUBBER TIRED, HEAVY DUTY EQUIPMENT OPERATOR; SKIPLOADER (WHEELTYPE, OVER 3-4 YARDS); SLIP FORM PUMP OPERATOR; TRACKOR OPERATOR, DRAG-TYPE SHOVEL, BULLDOZER, TAMPER, SCRAPER, AND PUSH TRACTOR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | 57.62 | 34.00 | 91.62 |
| POWER EQUIPMENT OPERATOR GROUP 4 ASPHALT PLANT FIREMAN; BORING MACHINE OPERATOR; BORING SYSTEMS ELECTRONIC TRACKING LOCATOR; BOXMAN OR MIXER BOX OPERATOR (CONCRETE OR ASPHALT PLANT); FISHING TOOL ENGINEER; HIGHLINE CABLEWAY SIGNALMAN; HORIZONTAL DIRECTIONAL DRILLING MACHINE; INSTRUMENTMAN; LOCOMOTIVE ENGINEER; MICO-TUNNELING (ABOVE GROUND TUNNEL); MINI EXCAVATOR OPERATOR; MUD PLANT OPERATOR; POWER SWEEPER OPERATOR; ROLLER OPERATOR (COMPACTING); SCREED OPERATOR; SEEDER; TRENCHING MACHINE OPERATOR, VACCUM TRUCK. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | 56.52 | 34.00 | 90.52 |
| POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE (SKIDSTEER); DERRICKMAN (ROTARY AND CORE); DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVATOR HOIST OPERATOR; EQUIPMENT GREASER; FORD, FERGUSON OR SIMILAR TYPE (WITH DRAG-TYPE ATTACHMENTS); HYDRA-HAMMER OR SIMILAR TYPE EQUIPMENT; MATERIAL HOIST/OUTSIDE MANLIFT OPERATOR; POWER CONCRETE CURING MACHINE; PPOWER CONCRETE SAW OPERATOR (OR SIMILAR TYPE); POWER DRIVEN JUMBO FORM SETTER OPERATOR; RODMAN & CHAINMAN; ROSS CARRIER OPERATOR; SELF-CLIMBING SCAFFOLD (OR SIMILAR TYPE); SELF-PROPELLED TAR PIPELINING MACHINE OPERATOR; STATIONARY PIPE WRAPPING AND CLEANING MACHINE OPERATOR; STEAM AND WATER PLANT OPERATOR; TOWBLADE OPERATOR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | 55.03 | 34.00 | 89.03 |
| POWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR (SKID TYPE); CONVEYOR AND BELTMAN; FIREMAN; GENERATOR PUMP OR COMPRESSOR OPERATOR; GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; HYDROSTATIC PUMP MOTORMAN (ROTARY AND CORE); PJU SIDEDUMP JACK; SCREENING AND CONVEYOR MACHINE (SIMILAR TYPE); SKIPLOADER (WHEELTYPE, FORD, FERGUSON, JEEP OR SIMILAR TYPE, 3/4 YARDS OR LESS, WITHOUT DRAG-TYPE ATTACHMENTS); TEMPORARY HEATING PLANT OPERATOR; TRUCK CRANE OILER. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | 54.74 | 34.00 | 88.74 |
| POWER EQUIPMENT OPERATOR GROUP 1 AIR COMPRESSOR, PUMP OR GENERATOR OPERATOR; BLADE OPERATOR, ENGINEER-OILER AND SIGNALMAN; RAIL MOUNTED JLG; ROTARY DRILL TENDER (ROTARY AND CORE); STEAM CLEANER/PRESSURE WASHER; SWITCHMAN OR BRAKEMAN (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | 53.79 | 34.00 | 87.79 |
| IRONWORKER (ZONE PAY- NNSS $5.50; NTTR $5.50) | 55.06 | 37.26 | 92.32 |
| LABORER GROUP 3 ASBESTOS ABATEMENT; HAZARDOUS WASTE; LEAD ABATEMENT; MICROBIAL REMEDIATION WHICH INCLUDES HANTAVIRUS; PETROCHEMICAL HANDLER; RADIATION WORKER. (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $5.55 SHOULD BE ADDED TO THE BASE RATE) | 41.57 | 27.22 | 68.79 |
| BUGGYMOBILE MAN; CEMENT DUMPER; CONCRETE CORE CUTTER, SAWMAN AND CEMENT GRINDING OPERATOR; CONCRETE CURER; CRIBBER OR SHORER; CUTTING TORCH OPERATOR (DEMOLITION); DRILLER; DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES; GAS & OIL PIPELINE WRAPPER; HEAD ROCK SLINGER; JACKHAMMER, DRILLER AND/OR PAVEMENT BREAKER; LAYING OF ALL NONMETALLIC PIPE, INCLUDING SEWER PIPE, DRAIN PIPE AND UNDERGROUND TILE; MACHINE TOOL OPERATOR (OPERATORS AND TENDERS OF PNEUMATIC & ELECTRIC TOOLS, VIBRATING MACHINES AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN, INCLUDING HAND GUIDED DITCH WITCH AND HAND-TYPE ROLLER); PAVING, AIRPORT RUNWAYS & SIMILAR WORK; PESTICIDE, HERBICIDE, INSECTICIDE APPLICATOR; POTHOLER; POWDERMAN; ROCK SLINGER; SANDBLASTER (NOZZLEMAN); SANDBLASTER (POT TENDER); SHOTCRETE (NOZZLEMAN); SHOTCRETE (POT TENDER); STEEL HEADERBOARD MAN (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $5.55 SHOULD BE ADDED TO THE BASE RATE) | 41.39 | 27.22 | 68.61 |
| LABORER GROUP 1 BUILDING/OFFICE CLEANUP: CESSPOOL DIGGER & INSTALLER; DRINKING WATER; FENCE BUILDER; FINE GRADER, HIGHWAY & STREET; FLAGPERSON; GAS & OIL PIPELINE LABORER; GAS & OIL PIPELINE WRAPPER - POT TENDER AND FORM MAN; GUINEA CHASER; PACKING ROD STEEL AND PLANS; GENERAL (CONSTRUCTION CLEANUP); DEMOLITION; LANDSCAPE GARDENER, NURSERYMAN AND GROUNDS KEEPER; MAKING & CAULKING OF ALL NONMETALLIC PIPE JOINTS; RIP RAP STONE PAVER; ROTO-SCRAPER; SCALER; SEPTIC TANK DIGGER & INSTALLER (LEADMAN); TANK SCALER AND CLEANER; TOOL ATTENDANT (JOBSITE ONLY); TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE OF BRUSH SHEDDERS; WINDOW CLEANER (ZONE PAY MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE SAVINGS ACCOUNT OF $5.55 SHOULD BE ADDED TO THE BASE RATE) | 41.13 | 27.22 | 68.35 |
| LABORER: BULLGANG, MUCKER, TRACKMAN (ZONE PAY MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | 46.44 | 27.27 | 73.71 |
| LABORER: MINER-TUNNEL HARDROCK (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | 46.69 | 27.27 | 73.96 |
| LABORER: SHAFT, RAISE, STOPE MINER (ZONE PAY MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | 47.69 | 27.27 | 74.96 |
| PAINTER: FLOORCOVERER, CARPET, LINOLEUM AND TILE GLAZIER (ZONE PAY- NNSS $5.00; NTTR $5.00) | 52.40 | 24.18 | 76.58 |
| PAINTER (ZONE PAY- NNSS $5.00; NTTR $5.00) | 51.79 | 24.18 | 75.97 |
| PAINTER, SPRAY AND PAPERHANGER SIGN (ZONE PAY- NNSS $5.00; NTTR $5.00) | 52.14 | 24.18 | 76.32 |
| PAINTER, TAPER, FLUSHER AND DETAILER (ZONE PAY- NNSS $5.00; NTTR $5.00) | 52.14 | 24.18 | 76.32 |
| PLASTERER (ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | 42.03 | 28.05 | 70.08 |
| CEMENT MASON (ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | 43.27 | 29.66 | 72.93 |
| PIPEFITTER: INCLUDING INERT GAS WELDER (ZONE PAY MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | 62.85 | 26.75 | 89.60 |
| PLUMBER: INCLUDLING LEAD BURNER (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | 62.85 | 26.75 | 89.60 |
| REFRIGERATION MECHANIC (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | 62.85 | 26.75 | 89.60 |
| ROOFER (INCLUDING WATERPROOFING) | 39.74 | 12.42 | 52.16 |
| SPRINKLER FITTER ZONE PAY ZONE A: LAS VEGAS - $0.00 ZONE B: NNSS - $4.50 ZONE C: NTTR - $4.50 | 56.69 | 28.62 | 85.31 |
| SHEET METAL WORKER (ZONE PAY: NNSS $5.50; NTTR $5.50) | 66.73 | 30.01 | 96.74 |
| TRUCK DRIVER, GROUP 5 TIREMAN (ZONE PAY ZONE 1 $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | 44.26 | 28.37 | 72.63 |
| TRUCK DRIVER, GROUP 4 BOOTMAN, OFF-ROAD AND SPECIAL EQUIPMENT DRIVER (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | 44.78 | 28.37 | 73.15 |
| TRUCK DRIVER, GROUP 3 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER (OVER 15 TONS). (ZONE PAY ZONE 1 $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | 44.06 | 28.37 | 72.43 |
| TRUCK DRIVER, GROUP 2 EQUIPMENT PARTS CLERK, FLEET OPERATIONS DISPATCHER, FORKLIFT DRIVER (UNDER 15 TONS), HEAVY DUTY DRIVER, WAREHOUSEMAN. (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | 43.86 | 28.37 | 72.23 |
| TRUCK DRIVER, GROUP 1 LIGHT DUTY DRIVER, LIGHT VEHICLE DISPATCHER, TRUCK GREASER. (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | 43.69 | 28.37 | 72.06 |