Building Published 05/18/2026. 42 classifications. Covers 1 county: Otero
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | 24.08 | 10.79 | 34.87 |
| ELECTRICIAN (EXCLUDING LOW VOLTAGE WIRING FOR ALARMS) | 38.00 | 9.82 | 47.82 |
| POWER EQUIPMENT OPERATOR ((8) CRANE) | 31.43 | 4.65 | 36.08 |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER) | 27.70 | 4.65 | 32.35 |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | 26.75 | 4.65 | 31.40 |
| IRONWORKER: ORNAMENTAL | 28.05 | 18.11 | 46.16 |
| IRONWORKER, STRUCTURAL (METAL BUILDING ERECTION ONLY) | 28.05 | 18.11 | 46.16 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | 43.07 | 16.60 | 59.67 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | 43.07 | 16.60 | 59.67 |
| SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | 37.50 | 18.51 | 56.01 |
| TRUCK DRIVER: WATER TRUCK | 16.26 | 4.93 | 21.19 |
| TRUCK DRIVER: PICKUP TRUCK | 15.91 | 3.13 | 19.04 |
| TRUCK DRIVER: DUMP TRUCK | 15.25 | 3.89 | 19.14 |
| TILE SETTER | 19.00 | — | 19.00 |
| TILE FINISHER | 14.02 | — | 14.02 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | 22.01 | 9.65 | 31.66 |
| ROOFER | 13.24 | 0.50 | 13.74 |
| PLASTERER | 12.00 | — | 12.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | 16.10 | 1.79 | 17.89 |
| OPERATOR: LOADER (FRONT END) | 21.55 | 4.97 | 26.52 |
| OPERATOR: GRADER/BLADE | 21.40 | 4.95 | 26.35 |
| OPERATOR: FORKLIFT | 21.13 | 4.83 | 25.96 |
| OPERATOR: BACKHOE | 20.95 | 4.73 | 25.68 |
| LABORER: PIPELAYER | 13.78 | 2.20 | 15.98 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 11.51 | 0.85 | 12.36 |
| LABORER: MASON TENDER - BRICK | 13.77 | 4.35 | 18.12 |
| LABORER: LANDSCAPE & IRRIGATION | 10.60 | 0.24 | 10.84 |
| LABORER: COMMON OR GENERAL | 13.61 | 3.89 | 17.50 |
| IRONWORKER, STRUCTURAL, EXCLUDES METAL BUILDING ERECTION | 22.00 | 9.03 | 31.03 |
| IRONWORKER, REINFORCING | 19.75 | 8.45 | 28.20 |
| INSULATOR - BATT | 24.44 | 8.43 | 32.87 |
| GLAZIER | 20.15 | 3.95 | 24.10 |
| FLOOR LAYER: CARPET | 22.31 | 0.30 | 22.61 |
| CEMENT MASON/CONCRETE FINISHER | 17.72 | 5.43 | 23.15 |
| ELECTRICIAN (Low Voltage Wiring for Alarms) | 28.25 | 6.62 | 34.87 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | 20.86 | 6.25 | 27.11 |
| CARPENTER (FORM WORK ONLY) | 20.46 | 5.61 | 26.07 |
| CARPENTER (DRYWALL HANGING ONLY) | 21.39 | 2.85 | 24.24 |
| CARPENTER (DRYWALL FINISHING/TAPING ONLY) | 20.18 | 4.54 | 24.72 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 20.79 | — | 20.79 |
| BRICKLAYER | 20.36 | 5.74 | 26.10 |
| BOILERMAKER | 21.77 | 3.98 | 25.75 |