Heavy Published 08/13/2026. 21 classifications. Covers 1 county: Essex
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON | 49.60 | 37.96 | 87.56 |
| CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) | 57.42 | 34.17 | 91.59 |
| ADDITIONAL FIFTY FEET THEREAFTER.) | 58.84 | 35.06 | 93.90 |
| ELECTRICIAN (WORK ON LINE VOLTAGE OF 440 OR 480 VOLTS: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS, FRAMES, LADDERS AND POLES, 40 FT. OR MORE ABOVE THE GROUND OR FLOOR (DOES NOT INCLUDE WORK FROM A MANLIFT): 20% PER HOUR ADDITIONAL WORK ON RADIO TOWERS, TRANSMISSION TOWERS AND SMOKESTACKS: 21% PER HOUR ADDITIONAL.) | 62.90 | 39.31 | 102.21 |
| ELECTRICIAN: CABLE SPLICER (WORK ON LINE VOLTAGE OF 440 OR 480 VOLTS: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS, FRAMES, LADDERS AND POLES, 40 FT. OR MORE ABOVE THE GROUND OR FLOOR (DOES NOT INCLUDE WORK FROM A MANLIFT): 20% PER HOUR ADDITIONAL. WORK ON RADIO TOWERS, TRANSMISSION TOWERS AND SMOKESTACKS: 21% PER HOUR ADDITIONAL.) | 73.59 | 45.99 | 119.58 |
| HOLIDAY | 52.88 | 37.50 | 90.38 |
| HOLIDAY | 56.59 | 37.50 | 94.09 |
| MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION 20% PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | 58.22 | 37.50 | 95.72 |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM (HAZARDOUS WASTE REMOVAL WORK WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | 60.13 | 37.50 | 97.63 |
| HOLIDAY | 61.72 | 37.50 | 99.22 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | 52.24 | 50.32 | 102.56 |
| IRONWORKER: REINFORCING | 49.94 | 50.32 | 100.26 |
| LABORER: MASON TENDER: CEMENT/CONCRETE | 29.35 | 23.07 | 52.42 |
| WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED | 51.65 | 38.53 | 90.18 |
| LABORER: COMMON OR GENERAL LABORER; LANDSCAPE LABORER, POWER TOOL OPERATOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED | 50.95 | 38.53 | 89.48 |
| PAINTER: WORK ON BRIDGES (MAJOR BRIDGES DESIGNED FOR COMMERCIAL NAVIGATION) | 58.28 | 33.85 | 92.13 |
| PAINTER: BRUSH AND ROLLER (REPAINT WORK, ON PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.) | 29.05 | 18.91 | 47.96 |
| PAINTER: BRUSH AND ROLLER (NEW CONSTRUCTION) | 40.19 | 22.72 | 62.91 |
| PIPEFITTER | 56.34 | 50.80 | 107.14 |
| A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER HAS BEEN ASSIGNED TO WORK, OR, ""SHAPES"", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | 46.51 | 31.82 | 78.33 |
| A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER HAS BEEN ASSIGNED TO WORK, OR, ""SHAPES"", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | 46.41 | 31.82 | 78.23 |