Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

NJ20260038 rev 1

Building  Published 05/18/2026. 39 classifications. Covers 1 county: Morris

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement)51.7446.2097.94
BRICKLAYER (INCLUDING CAULKING, CLEANING AND Work on high stacks: 22% per hour additional49.6037.9687.56
MASON - Work on high stacks: 22% per hour additional49.6037.9687.56
TILE SETTER64.9037.28102.18
TILE Work grouting all epoxy: $10.00 additional per day50.0533.9083.95
hour additional for each additional fifty feet thereafter57.4234.1791.59
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION)57.4234.1791.59
SOFT FLOOR LAYER57.4234.1791.59
MILLWRIGHT Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter58.8435.0693.90
ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING ELECTRICIAN. WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYMAN RATE65.4342.86108.29
ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING: CABLE SPLICER. WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT) 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYMAN RATE69.7244.27113.99
PAID VACATION: A worker who has worked less than 5 years: 4% of his or her hourly rate for all hours worked. A worker who has worked 5 to 10 years: 6% of his or her hourly rate for all hours worked. A worker who has worked 15 or more years: 8% of his or her hourly rate for all hours worked57.0127.6084.61
PAID VACATION: A worker who has worked less than 5 years: 4% of his or her hourly rate for all hours worked. A worker who has worked 5 to 10 years: 6% of his or her hourly rate for all hours worked. A worker who has worked 15 or more years: 8% of his or her hourly rate for all hours worked45.1427.4572.59
HOLIDAY52.8837.5090.38
POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY56.5937.5094.09
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY58.2237.5095.72
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY60.1337.5097.63
STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY61.7237.5099.22
IRONWORKER: STRUCTURAL AND ORNAMENTAL52.2450.32102.56
IRONWORKER: REINFORCING49.9450.32100.26
decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)28.3721.6249.99
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE36.5030.2266.72
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN35.7530.2265.97
DRYWALL FINISHER/TAPER44.8730.1575.02
GLAZIER WORK WELDING OR USING A CUTTING TORCH $1.00 PER HOUR ADDITIONAL. WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEIGHT OF THE PLATFORM IS 30 FT. OR ABOVE; AND ON MOTORIZED LIFTS PROVIDED THAT THE HEIGHT OF THE LIFT PLATFORM IS ABOVE THE SECOND FLOOR OR ABOVE THIRTY FEET: $1.00 PER HOUR ADDITIONAL52.6831.2983.97
PAINTER (SPRAY)45.5529.8675.41
CEMENT MASON/CONCRETE FINISHER54.6430.9585.59
PLASTERER54.6430.9585.59
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION)62.0945.05107.14
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (MORRIS COUNTY (DOES NOT INCLUDE THE BOROUGH OF CHATHAM; TOWNSHIP OF CHATHAM; BOROUGH OF CHESTER; TOWNSHIPS OF CHESTER, HARDING AND LONG HILL; BOROUGH OF MENDHAM; TOWNSHIPS OF MENDHAM AND MOUNT OLIVE; TOWNSHIP OF WASHINGTON (TOWN OF LONG VALLEY ONLY)))57.9740.2298.19
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (MORRIS COUNTY (BOROUGH OF CHATHAM; TOWNSHIP OF CHATHAM; BOROUGH OF CHESTER; TOWNSHIPS OF CHESTER, HARDING AND LONG HILL; BOROUGH OF MENDHAM; TOWNSHIPS OF MENDHAM AND MOUNT OLIVE; TOWNSHIP OF WASHINGTON (TOWN OF LONG VALLEY ONLY))56.3450.80107.14
ROOFER (INCLUDES ALL TYPES OF ROOFERS)44.5232.2576.77
SPRINKLER FITTER (FIRE SPRINKLERS)67.9739.35107.32
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION)51.3051.55102.85
PAINTER: BRUSH AND ROLLER32.915.7738.68
LABORER: LANDSCAPE24.70—24.70
LABORER: COMMON OR GENERAL27.609.8737.47
one day of the calendar week during which the holiday occurs46.4131.8278.23
one day of the calendar week during which the holiday occurs46.5131.8278.33
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.