Residential Published 05/18/2026. 18 classifications. Covers 1 county: Ocean
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 49.60 | 37.96 | 87.56 |
| ELECTRICIAN | 57.70 | 45.92 | 103.62 |
| holiday | 60.13 | 37.50 | 97.63 |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | 61.72 | 37.50 | 99.22 |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | 56.59 | 37.50 | 94.09 |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | 58.22 | 37.50 | 95.72 |
| IRONWORKERS: STRUCTURAL (NORTHERN THIRD OF COUNTY) | 52.24 | 50.32 | 102.56 |
| IRONWORKERS: REINFORCING (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) | 53.24 | 40.40 | 93.64 |
| IRONWORKERS: STRUCTURAL (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) | 54.24 | 40.40 | 94.64 |
| LABORER: MASON TENDER: CEMENT/CONCRETE | 29.35 | 23.07 | 52.42 |
| PLUMBER/PIPEFITTER (OCEAN COUNTY (north of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, continuing along State Highway Route 72 until it reaches the Burlington County line) | 34.25 | 21.31 | 55.56 |
| through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then,continuing along State Highway Route 72 until it reaches the Burlington County line) | 31.50 | 13.41 | 44.91 |
| ROOFER (ALL TYPES) | 34.35 | 21.75 | 56.10 |
| PAINTER: BRUSH AND ROLLER | 25.20 | 5.99 | 31.19 |
| LABORER: COMMON OR GENERAL | 12.33 | — | 12.33 |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | 13.50 | 2.34 | 15.84 |
| CEMENT MASON/CONCRETE FINISHER | 25.00 | — | 25.00 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 15.60 | 2.46 | 18.06 |