Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

NJ20260002 rev 2

Highway  Published 05/18/2026. 73 classifications. Covers 11 counties: Bergen, Essex, Hudson, Hunterdon, Middlesex, Morris, Passaic, Somerset, Sussex, Union, Warren

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
and Bridgewater, until that boundary line intersects with Route 78; then, continuing along Route 78 until Route 78 intersects with Route 525; then, continuing along Route 525 until Route 525 intersects with the boundary line between the Townships of Bridgewater and Warren; then, continuing along the boundary line between the Townships of Bridgewater and Warren until that boundary line intersects with Route 22; then, following Route 22 until Route 22 intersects with Sebrings Mills Rd. (also known as King George Rd.); then, continuing south on Sebrings Mills Rd. until it goes over Green Brook, which is the Middlesex County line); SUSSEX, UNION AND WARREN Work 100 degrees F. and over: to be paid at the rate of double Work on high stacks: 22% per hour additional49.6037.9687.56
along Chambers Brook until it becomes the boundary line between the Townships of Bernards and Bridgewater; then, continuing along the boundary line between the Townships of Bernards and Bridgewater, until that boundary line intersects with Route 78; then, continuing along Route 78 until Route 78 intersects with Route 525; then, continuing along Route 525 until Route 525 intersects with the boundary line between the Townships of Bridgewater and Warren; then, continuing along the boundary line between the Townships of Bridgewater and Warren until that boundary line intersects with Route 22; then, continuing along Route 22 until Route 22 intersects with Sebrings Mills Rd. (also known as King George Rd.); then, continuing south along Sebrings Mills Rd. until it goes over Green Brook, which is the Middlesex County Work 100 degrees F. and over: to be paid at the rate of double Work on high stacks: 22% per hour additional43.5632.5076.06
and Bridgewater, until that boundary line intersects with Route 78; then, continuing along Route 78 until Route 78 intersects with Route 525; then, continuing along Route 525 until Route 525 intersects with the boundary line between the Townships of Bridgewater and Warren; then, continuing along the boundary line between the Townships of Bridgewater and Warren until that boundary line intersects with Route 2; then, continuing along Route 22 until Route 22 intersects with Sebrings Mills Rd. (also known as King George Rd.); then, continuing south on Sebrings Mills Rd until it goes over Green Brook, which is the Middlesex County line); SUSSEX, UNION AND WARREN Cement mason: Epoxy, acid and latex work: $.50 per hour additional49.6037.9687.56
where it becomes Chambers Brook; then, continuing along Chambers Brook until it becomes the boundary line between the Townships of Bernards and Bridgewater; then, continuing along the boundary line between the Townships of Bernards and Bridgewater, until that boundary line intersects with Route 78; then, continuing along Route 78 until Route 78 intersects with Route 525; then, continuing along Route 525 until Route 525 intersects with the boundary line between the Townships of Bridgewater and Warren; then, continuing along the boundary line between the Townships of Bridgewater and Warren until that boundary line intersects with Route 22; then, continuing along Route 22 until Route 22 intersects with Sebrings Mills Rd. (also known as King George Rd.); then, continuing south along Sebrings Mills Rd. until it goes over Green Brook, which is the Middlesex County Cement mason: Epoxy, acid and latex work: $.50 per hour additional43.5632.5076.06
CARPENTER57.4234.0291.44
DOCK BUILDER & PILEDRIVERMEN WORK ON LAND PILE DRIVING, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRODUCTS: $.25 PER HOUR ADDITIONAL. Work on hazardous/toxic/contaminated waste removal, on a hazardous/toxic/contaminated waste site, where the worker comes into contact with hazardous/toxic/contaminated waste material, and when A, B or C personal protective equipme is required and used for respiratory, skin or eye protection: 20% per hour additional52.9852.44105.42
railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line; does not include the Township of Montgomery west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown-Zion road to the Hillsborough township line); SUSSEX, UNION AND WARREN COUNTIES) Work with, or the removal of, asbestos materials: 112% times the journeyman rate38.2123.9862.19
railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line; does not include the Township of Montgomery west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown-Zion road to the Hillsborough township line); SUSSEX, UNION AND WARREN COUNTIES) Work with, or the removal of, asbestos materials: 112% times the journeyman rate65.4342.20107.63
railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line; does not include the Township of Montgomery west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown-Zion road to the Hillsborough township line); SUSSEX, UNION AND WARREN COUNTIES) Work with, or the removal of, asbestos materials: 112% times the journeyman rate66.8641.95108.81
WARREN COUNTIES) Work with, or the removal of, asbestos materials: 112% times the journeyman rate61.8234.4696.28
WARREN COUNTIES) Work with, or the removal of, asbestos materials: 112% times the journeyman rate38.2118.8057.01
WARREN COUNTIES) Work with, or the removal of, asbestos materials: 112% times the journeyman rate65.4342.20107.63
railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line; does not include the Township of Montgomery west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown-Zion road to the Hillsborough township line); SUSSEX, UNION AND WARREN COUNTIES) Work with, or the removal of, asbestos materials: 112% times the journeyman rate56.2031.3387.53
Gardner, Hampton and High Bridge; Townships of Holland and Kingwood; Borough of Lebanon; Township of Lebanon; Borough of Milford; Township of Raritan (east of State Hwy. 31 and north of County Route 523); Townships of Readington, Tewksbury and Union); MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (does not include the Township of Franklin east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line; does not include the Township of Montgomery west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown-Zion road to the Hillsborough township line); SUSSEX, UNION AND WARREN COUNTIES) Work with, or the removal of, asbestos materials: 112% times the journeyman rate59.0132.9091.91
railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line; does not include the Township of Montgomery west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown-Zion road to the Hillsborough township line); SUSSEX, UNION AND WARREN COUNTIES) Work with, or the removal of, asbestos materials: 112% times the journeyman rate71.9746.42118.39
along Harlingen Rd. and the Dutchtown-Zion road to the Hillsborough township line)63.8241.99105.81
along Harlingen Rd. and the Dutchtown-Zion road to the Hillsborough township line)39.8324.2764.10
township line)49.7930.3480.13
township line)39.8324.2764.10
LINE CONSTRUCTION: ALL OTHER WORK: LINE TECHNICIAN; CABLE SPLICER; HEAVY EQUIPMENT OPERATOR. (HUNTERDON COUNTY (Township of Delaware (east of a line following County Route 523 from the Delaware River north to the Raritan Township line); Township of East Amwell (west of State Hwy. 31); Borough of Flemington; City of Lambertville; Township of Raritan (west of State Hwy. 31 and south of County Route 523); Borough of Stockton; Township of West Amwell); SOMERSET COUNTY (Township of Montgomery (west and south of a line following U.S. Hwy. 206 (formerly State Hwy. 31) north from the Mercer County line to Harlingen Rd.; then, west along Harlingen Rd. and the Dutchtown-Zion road to the Hillsborough township line)49.7930.3480.13
ELECTRICIAN: CABLE SPLICER (MIDDLESEX COUNTY; SOMERSET COUNTY (Township of Franklin (east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County Work on line voltage of 440 volts and over: 10% per hour Work from trusses, scaffolds and ladders 40 ft. or more from the ground or floor; or under air pressure; or over conveyors or moving equipment or machinery: 10% per hour additional65.3546.56111.91
railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County Work on line voltage of 440 volts and over: 10% per hour Work from trusses, scaffolds and ladders 40 ft. or more from the ground or floor; or under air pressure; or over conveyors or moving equipment or machinery: 10% per hour additional61.4039.14100.54
LINE CONSTRUCTION: (CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS:) CABLE SPLICER. (MIDDLESEX COUNTY; SOMERSET COUNTY (Township of Franklin (east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line))59.4740.2999.76
LINE CONSTRUCTION: (CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS:) CRANE OPERATOR. (MIDDLESEX COUNTY; SOMERSET COUNTY (Township of Franklin (east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line))59.4740.2999.76
Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line))31.0321.0252.05
LINE CONSTRUCTION: (CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS:) GROUNDMAN; WINCH OPERATOR (MIDDLESEX COUNTY; SOMERSET COUNTY (Township of Franklin (east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line))50.9234.5085.42
LINE CONSTRUCTION: (CONTINUOUS PIPE-TYPE UNDERGROUND OIL-FILLED TRANSMISSION CONDUIT INSTALLATIONS:) LINE TECHNICIAN; X-RAY TECHNICIAN; EQUIPMENT REPAIR PERSON; EQUIPMENT SERVICEPERSON; ELECTRICAL INSTALLATION WORKER; HOLE-DIGGING EQUIPMENT OPERATOR; TRUCK OPERATOR WITH WINCH OR POLE; TURCK OPERATOR WITHOUT WINCH. (MIDDLESEX COUNTY; SOMERSET COUNTY (Township of Franklin (east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line))51.7135.0386.74
LINE CONSTRUCTION: (ALL OTHER WORK:) CABLE SPLICER (MIDDLESEX COUNTY; SOMERSET COUNTY (Township of Franklin (east of a line following Cedar Grove Lane from the Raritan River, in a southwesterly direction, to the Millstone Branch of the Pennsylvania Railroad; then, west along the railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line))59.4640.2899.74
railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line))58.4439.5998.03
railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line))51.7135.0386.74
railroad to the Delaware and Raritan Canal; then, south along the canal to the Middlesex County line))50.9234.5085.42
POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP 1) CRANES (ALL CRANES, LAND OR FLOATING WITH BOOM INCLUDING JIB, 140 FT. AND OVER, ABOVE GROUND); DERRICKS (ALL DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOM INCLUDING JIB, 140 FT. AND OVER, ABOVE GROUND) HAZARDOUS WASTE REMOVAL WORK WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY70.2437.50107.74
POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP 2) CRANES (ALL CRANES, LAND OR FLOATING WITH BOOM INCLUDING JIB, LESS THAN 140 FT. ABOVE GROUND); DERRICKS (ALL DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOM INCLUDING JIB, LESS THAN 140 FT. ABOVE GROUND) HAZARDOUS WASTE REMOVAL WORK WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY68.5837.50106.08
POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP 3) HELICOPTER PILOT HAZARDOUS WASTE REMOVAL WORK WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY61.2937.5098.79
DIESEL, ELECTRIC, AIR, HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE OF HOISTING MACHINE, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE); JACK (SCREW, AIR, HYDRAULIC POWER-OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOM; STRADDLE CARRIER HAZARDOUS WASTE REMOVAL WORK WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY58.6337.5096.13
HOLIDAY57.1037.5094.60
MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY53.3437.5090.84
POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP 7) OILER; DECKHAND HAZARDOUS WASTE REMOVAL WORK WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY65.7437.50103.24
HOLIDAY61.7237.5099.22
HOLIDAY60.1337.5097.63
CUTTING TOOL SYSTEM OPERATOR/MAINTENANCE TECHNICIAN, WHEN USED FOR DECONTAMINATION AND REMEDIATION; VACUUM BLASTING MACHINE OPERATOR/MAINTENANCE TECHNICIAN, WHEN USED FOR DECONTAMINATION AND REMEDIATION; VIBRATING PLANT (USED IN CONJUNCTION WITH UNLOADING); WELDER AND REPAIR MECHANIC HAZARDOUS WASTE REMOVAL WORK WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY58.2237.5095.72
MULTIPLE (RECTIFIER, TRANSFORMER TYPE); WELLPOINT SYSTEM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY56.5937.5094.09
POWER EQUIPMENT OPERATORS: GROUP 5 OILER; TIRE REPAIR AND MAINTENANCE HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY52.8837.5090.38
POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTER PILOT; HELICOPTER ENGINEER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY63.5437.50101.04
IRONWORKERS: REINFORCING (BERGEN, ESSEX, HUDSON AND HUNTERDON COUNTIES; MIDDLESEX COUNTY (north half); MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (north half); SUSSEX AND UNION COUNTIES)49.9450.32100.26
IRONWORKERS: STRUCTURAL (BERGEN, ESSEX, HUDSON AND HUNTERDON COUNTIES; MIDDLESEX COUNTY (north half); MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (north half); SUSSEX AND UNION COUNTIES)52.2450.32102.56
IRONWORKERS (WARREN COUNTY)34.0524.0058.05
personal protection: $3.00 per hour additional54.2438.4092.64
WRAPPER AND COATER OF PIPE; WATERPROOFING LABORER; TIMBER PERSON; POWDER CARRIER; MAGAZINE TENDER; SIGNAL PERSON; POWER BUGGY OPERATOR; TREE CUTTER; AND THE OPERATION OF SUCH OTHER BASIC POWER TOOLS USED TO PERFORM WORK USUALLY DONE MANUALLY BY LABORERS HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED50.9538.5389.48
PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED51.6538.5390.18
WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED51.9038.5390.43
WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED55.4538.5393.98
WITHIN A PERIOD OF TEN WORKING DAYS, CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED50.9538.5389.48
DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS, CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED51.6538.5390.18
DAYS, CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED51.9038.5390.43
WITHIN A PERIOD OF TEN WORKING DAYS, CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED55.4538.5393.98
PAINTERS: WORK ON BRIDGES (ALL BRIDGES THAT SPAN MAJOR WATERWAYS, RAILROAD BRIDGES, BRIDGES OVER CANYONS, OVERPASSES)59.2933.5692.85
PAINTERS: (ALL OTHER WORK) BRUSH AND ROLLER45.5529.8675.41
PAINTERS: (ALL OTHER WORK) SPRAY45.5529.8675.41
CEMENT MASON (BERGEN, ESSEX, HUDSON, MORRIS, PASSAIC, SUSSEX, UNION AND WARREN Cement masons: Work on suspended staging, not supported from the ground: $.50 per hour additional54.6430.9585.59
CEMENT MASON (HUNTERDON, MIDDLESEX, SOMERSET AND UNION COUNTIES)53.2133.4286.63
TRUCK DRIVERS: GROUP 1 WINCH TRAILER DRIVER (ESSEX, MORRIS, SUSSEX AND UNION COUNTIES)46.6131.8278.43
ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS46.5131.8278.33
PERSONAL PROTECTION FOR ANY OF THE WORKERS: $3.00 PER HOUR ADDITIONAL. HAZARDOUS WASTE REMOVAL WORK, WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER HAS BEEN ASSIGNED TO WORK, OR, ""SHAPES"", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS46.4131.8278.23
A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER HAS BEEN ASSIGNED TO WORK, OR, ""SHAPES"", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS45.7731.8277.59
A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER HAS BEEN ASSIGNED TO WORK, OR, ""SHAPES"", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY FALLS48.8842.6691.54
A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER HAS BEEN ASSIGNED TO WORK, OR, ""SHAPES"", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY FALLS48.7842.6691.44
ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY FALLS48.6842.6691.34
PERSONAL PROTECTION FOR ANY OF THE WORKERS: $3.00 PER HOUR ADDITIONAL. HAZARDOUS WASTE REMOVAL WORK, WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER HAS BEEN ASSIGNED TO WORK, OR, ""SHAPES"", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY FALLS48.6342.6691.29
ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL B, C OR D PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS BEEN ASSIGNED TO WORK, OR, ""SHAPES"", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS47.3644.1791.53
ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL B, C OR D PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS BEEN ASSIGNED TO WORK, OR, ""SHAPES"", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS47.4144.1791.58
MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL B, C OR D PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS BEEN ASSIGNED TO WORK, OR, ""SHAPES"", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS47.5144.1791.68
(BERGEN, HUDSON AND PASSAIC COUNTIES) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL B, C OR D PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS BEEN ASSIGNED TO WORK, OR, ""SHAPES"", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS47.6144.1791.78
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.