Highway Published 05/18/2026. 31 classifications. Covers 1 county: Hillsborough
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY TRUCK | 22.75 | 4.95 | 27.70 |
| TRUCK DRIVER: DUMP TRUCK | 19.06 | 3.37 | 22.43 |
| TRAFFIC CONTROL: FLAGGER | 14.82 | 1.37 | 16.19 |
| PAINTER: SPRAY | 27.29 | 6.95 | 34.24 |
| OPERATOR: ROLLER | 27.19 | 6.12 | 33.31 |
| OPERATOR: POUNDER | 35.06 | 7.75 | 42.81 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 28.25 | 6.51 | 34.76 |
| OPERATOR: MILLING MACHINE | 29.25 | 5.47 | 34.72 |
| OPERATOR: MECHANIC | 25.12 | 3.44 | 28.56 |
| OPERATOR: LOADER | 25.40 | 7.51 | 32.91 |
| OPERATOR: GRADER/BLADE | 25.96 | 6.00 | 31.96 |
| OPERATOR: CRANE | 29.76 | 3.29 | 33.05 |
| OPERATOR: BULLDOZER | 25.97 | 6.59 | 32.56 |
| OPERATOR: BUCKET | 30.00 | — | 30.00 |
| OPERATOR: BROOM/SWEEPER | 23.09 | 5.09 | 28.18 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 20.21 | 3.98 | 24.19 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 24.98 | 7.21 | 32.19 |
| OPERATOR: AUGER | 26.07 | — | 26.07 |
| LABORER: PIPELAYER | 19.02 | 2.72 | 21.74 |
| LABORER: LANDSCAPE | 18.34 | 2.85 | 21.19 |
| LABORER: COMMON OR GENERAL | 18.62 | 2.60 | 21.22 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 23.03 | 8.88 | 31.91 |
| IRONWORKER, STRUCTURAL | 34.45 | 17.20 | 51.65 |
| IRONWORKER, REINFORCING | 22.59 | 2.00 | 24.59 |
| INSTALLER - GUARDRAIL | 29.25 | 5.56 | 34.81 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 20.87 | — | 20.87 |
| FENCE ERECTOR (CHAIN LINK FENCE) | 19.59 | — | 19.59 |
| ELECTRICIAN | 29.00 | 2.78 | 31.78 |
| CEMENT MASON/CONCRETE FINISHER | 21.81 | — | 21.81 |
| CARPENTER, EXCLUDES FORM WORK | 26.23 | 2.51 | 28.74 |
| CARPENTER (FORM WORK ONLY) | 23.11 | 1.06 | 24.17 |