Building Published 05/18/2026. 21 classifications. Covers 1 county: Avery
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION) | 31.66 | 12.69 | 44.35 |
| TRUCK DRIVER: DUMP TRUCK | 12.69 | 1.36 | 14.05 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | 13.61 | 1.10 | 14.71 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 15.62 | 2.09 | 17.71 |
| ROOFER | 13.55 | 0.80 | 14.35 |
| PLUMBER, EXCLUDES HVAC UNIT INSTALLATION | 17.51 | 2.33 | 19.84 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 14.77 | 1.87 | 16.64 |
| OPERATOR: GRADER/BLADE | 15.25 | 1.52 | 16.77 |
| OPERATOR: CRANE | 19.25 | 2.37 | 21.62 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 18.60 | 1.41 | 20.01 |
| LABORER: MASON TENDER-BRICK/CEMENT/CONCRETE | 10.00 | — | 10.00 |
| LABORER: LANDSCAPE & IRRIGATION | 10.29 | 1.82 | 12.11 |
| LABORER: COMMON OR GENERAL | 11.07 | 1.10 | 12.17 |
| IRONWORKER, STRUCTURAL | 18.75 | 5.62 | 24.37 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | 16.94 | 3.04 | 19.98 |
| ELECTRICIAN | 15.37 | 0.40 | 15.77 |
| CEMENT MASON/CONCRETE FINISHER | 14.02 | — | 14.02 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | 15.60 | 2.25 | 17.85 |
| CARPENTER (FORM WORK ONLY) | 14.28 | 1.13 | 15.41 |
| CARPENTER (DRYWALL HANGING ONLY) | 17.59 | 2.31 | 19.90 |
| BRICKLAYER | 18.45 | 4.18 | 22.63 |