Building Published 05/18/2026. 22 classifications. Covers 1 county: Gaston
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| DRYWALL HANGER | 29.00 | 11.20 | 40.20 |
| ELECTRICIAN | 32.31 | 13.66 | 45.97 |
| IRONWORKER | 29.75 | 18.00 | 47.75 |
| PIPEFITTER | 33.96 | 13.48 | 47.44 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 30.74 | 16.51 | 47.25 |
| TRUCK DRIVER: DUMP TRUCK | 16.56 | 3.09 | 19.65 |
| SPRINKLER FITTER | 18.35 | 3.06 | 21.41 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 19.67 13.27 ROOFER | 18.26 | 4.38 | 22.64 |
| PLUMBER | 22.96 | 4.81 | 27.77 |
| PAINTER | 15.55 | 1.05 | 16.60 |
| OPERATOR: ROLLER | 15.31 | 1.46 | 16.77 |
| OPERATOR: GRADER/BLADE | 22.68 | 3.27 | 25.95 |
| OPERATOR: FORKLIFT | 16.75 | — | 16.75 |
| OPERATOR: BULLDOZER | 17.54 | 2.63 | 20.17 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 16.50 | 0.08 | 16.58 |
| LABORER: PIPELAYER | 15.00 | 2.46 | 17.46 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 13.00 | 4.54 | 17.54 |
| LABORER: MASON TENDER - BRICK | 13.17 | — | 13.17 |
| LABORER: COMMON OR GENERAL | 14.12 | 2.79 | 16.91 |
| CEMENT MASON/CONCRETE FINISHER | 18.79 | — | 18.79 |
| CARPENTER, EXCLUDES DRYWALL HANGING | 19.78 | 5.50 | 25.28 |
| BRICKLAYER | 19.00 | — | 19.00 |