Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

MS20260074 rev 2

Heavy  Published 05/18/2026. 10 classifications. Covers 12 counties: Clarke, George, Greene, Jasper, Kemper, Leake, Neshoba, Newton, Pearl River, Smith, Stone, Wayne

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
ELECTRICIAN33.3011.6344.93
IRONWORKER: STRUCTURAL21.008.8129.81
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES13.25—13.25
OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINES14.71—14.71
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES14.68—14.68
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES12.00—12.00
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES12.71—12.71
IRONWORKER, REINFORCING18.50—18.50
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES14.98—14.98
CARPENTER, INCLUDES FORM WORK16.54—16.54
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.