Building Published 05/18/2026. 20 classifications. Covers 1 county: Hancock
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | 32.90 | 11.10 | 44.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 35.50 | 14.55 | 50.05 |
| POWER EQUIPMENT OPERATOR: CRANE | 35.50 | 14.55 | 50.05 |
| IRONWORKER, REINFORCING | 31.00 | 17.77 | 48.77 |
| PLUMBER (INCLUDES HVAC PIPE AND HVAC UNIT INSTALLATION) | 29.91 | 11.97 | 41.88 |
| PIPEFITTER (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | 30.41 | 11.47 | 41.88 |
| SPRINKLER FITTER: FIRE SPRINKLER | 32.65 | 23.55 | 56.20 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 30.45 | 13.88 | 44.33 |
| TRUCK DRIVER: DUMP TRUCK | 14.11 | 0.27 | 14.38 |
| TILE SETTER | 18.00 | — | 18.00 |
| ROOFER | 14.50 | — | 14.50 |
| PAINTER (BRUSH AND ROLLER) | 17.00 | — | 17.00 |
| OPERATOR: BULLDOZER | 15.14 | 1.03 | 16.17 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 17.89 | 1.62 | 19.51 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 12.50 | — | 12.50 |
| LABORER: COMMON OR GENERAL | 10.56 | — | 10.56 |
| IRONWORKER, STRUCTURAL | 18.05 | — | 18.05 |
| CEMENT MASON/CONCRETE FINISHER | 18.37 | — | 18.37 |
| CARPENTER, INCLUDES DRYWALL HANGING, FINISHING/TAPING AND FORM WORK | 23.31 | 2.26 | 25.57 |
| BRICKLAYER | 20.29 | — | 20.29 |