Building Published 05/18/2026. 31 classifications. Covers 1 county: Pulaski
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 31.97 | 14.00 | 45.97 |
| TILE SETTER | 32.79 | 21.31 | 54.10 |
| CARPENTER (INCLUDING DRYWALL HANGING & FORM WORK) | 44.19 | 21.85 | 66.04 |
| CARPENTER (FLOOR LAYER) (RESILIENT & VINYL FLOORING ONLY) | 40.08 | 21.85 | 61.93 |
| ELECTRICIAN | 39.70 | 19.84 | 59.54 |
| POWER EQUIPMENT OPERATOR: ROLLER | 35.76 | 30.38 | 66.14 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | 39.06 | 30.38 | 69.44 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | 39.06 | 30.38 | 69.44 |
| POWER EQUIPMENT OPERATOR: (PAVER) | 39.06 | 30.38 | 69.44 |
| POWER EQUIPMENT OPERATOR: (LOADER) | 39.06 | 30.38 | 69.44 |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE) | 39.06 | 30.38 | 69.44 |
| IRONWORKER, STRUCTURAL | 41.67 | 31.25 | 72.92 |
| LABORER (COMMON OR GENERAL & LANDSCAPE) | 30.33 | 15.30 | 45.63 |
| LABORER (BRICK MASON TENDER) | 32.23 | 15.30 | 47.53 |
| PAINTER: DRYWALL FINISHING/TAPING | 33.90 | 17.21 | 51.11 |
| PAINTER (BRUSH & ROLLER ONLY) | 33.90 | 17.21 | 51.11 |
| CEMENT MASON/CONCRETE FINISHER | 36.63 | 9.85 | 46.48 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | 50.66 | 23.34 | 74.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | 52.60 | 29.93 | 82.53 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | 50.66 | 23.34 | 74.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | 52.60 | 29.93 | 82.53 |
| ROOFER | 33.60 | 19.99 | 53.59 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 45.94 | 27.53 | 73.47 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION ONLY) | 52.00 | 27.12 | 79.12 |
| TRUCK DRIVER: DUMP TRUCK | 25.57 | — | 25.57 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | 23.65 | 4.50 | 28.15 |
| PAINTER: SPRAY | 18.79 | 8.12 | 26.91 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | 24.90 | — | 24.90 |
| IRONWORKER, REINFORCING | 20.90 | 8.88 | 29.78 |
| GLAZIER | 29.87 | 1.47 | 31.34 |
| BRICKLAYER | 23.65 | 7.92 | 31.57 |