Building Published 05/18/2026. 27 classifications. Covers 1 county: Pettis
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 45.60 | 35.47 | 81.07 |
| TILE SETTER | 32.79 | 21.31 | 54.10 |
| BRICKLAYER | 32.79 | 21.31 | 54.10 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | 31.51 | 22.25 | 53.76 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS) | 51.01 | 26.25 | 77.26 |
| ELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | 60.69 | 38.44 | 99.13 |
| POWER EQUIPMENT OPERATOR: ROLLER | 45.48 | 22.42 | 67.90 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | 45.48 | 22.42 | 67.90 |
| POWER EQUIPMENT OPERATOR: (LOADER) | 45.48 | 22.42 | 67.90 |
| IRONWORKER: REINFORCING AND STRUCTURAL | 39.00 | 34.25 | 73.25 |
| LABORER (LANDSCAPE) | 26.50 | 13.18 | 39.68 |
| LABORER (BRICK MASON TENDER) | 28.00 | 13.18 | 41.18 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | 25.39 | 17.76 | 43.15 |
| PAINTER (BRUSH & ROLLER ONLY) | 24.43 | 17.76 | 42.19 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | 58.38 | 25.29 | 83.67 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | 57.51 | 28.35 | 85.86 |
| ROOFER | 38.45 | 22.29 | 60.74 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | 47.20 | 26.28 | 73.48 |
| TRUCK DRIVER: DUMP TRUCK | 28.92 | — | 28.92 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | 30.08 | 9.91 | 39.99 |
| PAINTER: SPRAY | 18.79 | 8.12 | 26.91 |
| OPERATOR: WATER TRUCK | 28.37 | — | 28.37 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 24.47 | — | 24.47 |
| OPERATOR: BACKHOE/TRACKHOE | 23.55 | 7.47 | 31.02 |
| LABORER: COMMON OR GENERAL | 17.98 | 7.28 | 25.26 |
| GLAZIER | 22.71 | — | 22.71 |
| CEMENT MASON/CONCRETE FINISHER | 17.95 | 6.64 | 24.59 |