Building Published 05/18/2026. 28 classifications. Covers 1 county: Cooper
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 45.60 | 35.47 | 81.07 |
| TILE SETTER | 32.79 | 21.31 | 54.10 |
| CARPENTER (INCLUDING DRYWALL HANGING, FORM WORK & RESILIENT/VINYL FLOOR INSTALLATION) | 31.51 | 22.25 | 53.76 |
| ELECTRICIAN | 54.01 | 27.85 | 81.86 |
| POWER EQUIPMENT OPERATOR: ROLLER | 45.48 | 22.42 | 67.90 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | 45.48 | 22.42 | 67.90 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE | 45.48 | 22.42 | 67.90 |
| POWER EQUIPMENT OPERATOR: (PAVER) | 45.48 | 22.42 | 67.90 |
| POWER EQUIPMENT OPERATOR: (LOADER) | 45.48 | 22.42 | 67.90 |
| IRONWORKER, STRUCTURAL | 36.00 | 34.25 | 70.25 |
| LABORER (COMMON OR GENERAL & LANDSCAPE) | 28.78 | 16.05 | 44.83 |
| LABORER (BRICK MASON TENDER) | 30.78 | 16.05 | 46.83 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | 25.39 | 17.76 | 43.15 |
| PAINTER (BRUSH & ROLLER ONLY) | 24.43 | 17.76 | 42.19 |
| CEMENT MASON/CONCRETE FINISHER | 33.52 | 15.88 | 49.40 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | 50.66 | 23.34 | 74.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | 52.60 | 29.93 | 82.53 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | 50.66 | 23.34 | 74.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | 52.60 | 29.93 | 82.53 |
| ROOFER | 33.60 | 19.99 | 53.59 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 45.94 | 27.53 | 73.47 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | 36.51 | 22.39 | 58.90 |
| TRUCK DRIVER: DUMP TRUCK | 25.57 | — | 25.57 |
| PAINTER: SPRAY | 18.79 | 8.12 | 26.91 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | 24.90 | — | 24.90 |
| IRONWORKER, REINFORCING | 21.02 | 9.49 | 30.51 |
| GLAZIER | 29.87 | 1.47 | 31.34 |
| BRICKLAYER | 27.66 | 5.88 | 33.54 |