Residential Published 05/18/2026. 19 classifications. Covers 2 counties: Benton, Stearns
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (WOODFRAME ONLY) | 43.86 | 17.70 | 61.56 |
| CARPENTER (EXCLUDES WOODFRAME) | 36.71 | 20.17 | 56.88 |
| ELECTRICIAN (BENTON EAST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER & STEARNS) | 52.00 | 32.80 | 84.80 |
| ELECTRICIAN, ELECTRICAL CONTRACTS UNDER $5 MILLION (BENTON WEST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER) | 50.00 | 30.86 | 80.86 |
| ELECTRICIAN, ELECTRICAL CONTRACTS $5 MILLION AND OVER: (BENTON WEST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER) | 50.45 | 31.14 | 81.59 |
| OPERATOR: POWER EQUIPMENT GROUP 8 OILER | 28.29 | 15.95 | 44.24 |
| OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE | 31.42 | 15.95 | 47.37 |
| OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 | 32.93 | 15.95 | 48.88 |
| OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE | 33.10 | 15.95 | 49.05 |
| OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE | 34.85 | 15.95 | 50.80 |
| IRONWORKER: STRUCTURAL | 46.35 | 36.86 | 83.21 |
| LABORERS: GROUP 2 PIPELAYER PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR | 22.56 | 14.97 | 37.53 |
| LABORERS: GROUP 1 MASON TENDER (BRICK, CEMENT/CONCRETE) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR | 21.81 | 14.97 | 36.78 |
| PAINTER: SPRAY. PROJECTS UNDER $8,000: RECEIVE 80% OF BASIC HOURLY RATE | 24.91 | 13.31 | 38.22 |
| PLUMBER. FOOTNOTE: PAID HOLIDAY: LABOR DAY | 53.16 | 32.21 | 85.37 |
| ROOFER | 42.93 | 22.87 | 65.80 |
| SHEET METAL WORKER | 35.60 | 25.14 | 60.74 |
| LABORER: LANDSCAPE | 11.50 | — | 11.50 |
| LABORER: COMMON OR GENERAL | 13.26 | 2.81 | 16.07 |