ClassificationBase rateFringeTotal
BOILERMAKER43.5037.6481.14
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR32.2023.4655.66
PLASTERER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR33.0926.5859.67
BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR35.8322.1858.01
CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION)31.5021.1552.65
CARPENTER (ALL OTHER WORK)31.5021.1552.65
MILLWRIGHT40.0426.4766.51
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)35.6823.3659.04
POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY31.2325.2556.48
POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY33.7125.2558.96
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY39.5725.2564.82
POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY41.2825.2566.53
POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY43.9325.2569.18
POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY47.2825.2572.53
IRONWORKER: STRUCTURAL36.5529.5166.06
IRONWORKER: REINFORCING36.5529.5166.06
IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY)30.0227.4357.45
LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION30.7212.9543.67
LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION23.3411.6034.94
PAINTER: BRUSH, ROLLER, AND SPRAY ONLY27.0716.5643.63
PAINTER (DRYWALL FINISHING/TAPING ONLY)27.3216.7244.04
CEMENT MASON/CONCRETE FINISHER21.1512.7833.93
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)37.0922.5259.61
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION).$ 37.89 23.67 PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION)37.8923.6761.56
SPRINKLER FITTER (FIRE SPRINKLERS)41.3427.3968.73
SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION)35.4115.8651.27
SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION)35.4115.8651.27
TRUCK DRIVER: FLATBED TRUCK16.803.9720.77
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK15.653.1218.77
ROOFER15.737.4123.14
OPERATOR: TRACTOR19.607.3126.91
OPERATOR: ROLLER28.027.0735.09
OPERATOR: GRADER/BLADE24.046.0330.07
OPERATOR: BULLDOZER22.341.2223.56
LABORER: LANDSCAPE & IRRIGATION12.84—12.84
GLAZIER16.954.7421.69
FLOOR LAYER: CARPET19.597.5727.16
ASBESTOS WORKER/HEAT & FROST INSULATOR19.827.3127.13
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.