Building Published 05/18/2026. 31 classifications. Covers 1 county: Mason
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 43.50 | 37.64 | 81.14 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYER-CARPET) | 31.50 | 21.15 | 52.65 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION) | 31.50 | 21.15 | 52.65 |
| MILLWRIGHT | 40.04 | 26.47 | 66.51 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF AMBER, BRANCH, CUSTER, EDEN, HAMLIN, LOGAN, PERE MARQUETTE, RIVERTON, SHERIDAN, SHERMAN, SUMMIT, & VICTORY) | 35.68 | 23.36 | 59.04 |
| ELECTRICIAN: EXCLUDING LOW VOLTAGE (TOWNSHIPS OF FREESOIL, GRANT & MEADE) | 36.62 | 23.05 | 59.67 |
| POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 31.23 | 25.25 | 56.48 |
| POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 33.71 | 25.25 | 58.96 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 41.28 | 25.25 | 66.53 |
| POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 43.93 | 25.25 | 69.18 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 47.28 | 25.25 | 72.53 |
| IRONWORKER: STRUCTURAL | 36.55 | 29.51 | 66.06 |
| IRONWORKER: REINFORCING | 36.55 | 29.51 | 66.06 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | 30.02 | 27.43 | 57.45 |
| LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | 30.72 | 12.95 | 43.67 |
| LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | 23.34 | 11.60 | 34.94 |
| CEMENT MASON/CONCRETE FINISHER | 22.02 | 12.38 | 34.40 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | 35.41 | 15.86 | 51.27 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | 35.41 | 15.86 | 51.27 |
| TRUCK DRIVER: FLATBED TRUCK | 16.80 | 3.97 | 20.77 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | 15.65 | 3.12 | 18.77 |
| ROOFER | 15.73 | 7.41 | 23.14 |
| OPERATOR: TRACTOR | 19.60 | 7.31 | 26.91 |
| OPERATOR: ROLLER | 28.02 | 7.07 | 35.09 |
| OPERATOR: GRADER/BLADE | 24.04 | 6.03 | 30.07 |
| OPERATOR: BULLDOZER | 22.34 | 1.22 | 23.56 |
| LABORER: LANDSCAPE & IRRIGATION | 12.84 | — | 12.84 |
| GLAZIER | 16.95 | 4.74 | 21.69 |
| FLOOR LAYER: CARPET | 19.59 | 7.57 | 27.16 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 19.82 | 7.31 | 27.13 |