Building Published 05/18/2026. 42 classifications. Covers 1 county: Lenawee
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF BLISSFIELD, CLINTON, DEERFIELD, FAIRFIELD, MACON, OGDEN, PALMYRA, RAISIN, RIDGEWAY, RIGA, & TECUMSEH) | 36.00 | 20.15 | 56.15 |
| BOILERMAKER | 43.50 | 37.64 | 81.14 |
| TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | 35.83 | 22.18 | 58.01 |
| BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | 35.83 | 22.18 | 58.01 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | 35.41 | 21.06 | 56.47 |
| MILLWRIGHT | 42.92 | 39.13 | 82.05 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | 48.40 | 17.79 | 66.19 |
| FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 35.29 | 25.35 | 60.64 |
| STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 43.63 | 25.35 | 68.98 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 45.34 | 25.35 | 70.69 |
| POWER EQUIPMENT OPERATOR: GROUP 6 REGULAR CRANE OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 46.31 | 25.35 | 71.66 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 47.17 | 25.35 | 72.52 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 47.99 | 25.35 | 73.34 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 48.29 | 25.35 | 73.64 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 49.79 | 25.35 | 75.14 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 51.29 | 25.35 | 76.64 |
| IRONWORKER: REINFORCING & STRUCTURAL | 35.50 | 29.20 | 64.70 |
| LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; AND SANDBLASTER) | 32.35 | 13.45 | 45.80 |
| PAINTER: SPRAY | 26.86 | 17.66 | 44.52 |
| PAINTER: DRYWALL FINISHING/TAPING | 32.85 | 20.41 | 53.26 |
| PAINTER: BRUSH AND ROLLER | 32.85 | 20.41 | 53.26 |
| PLASTERER | 27.41 | 16.10 | 43.51 |
| CEMENT MASON/CONCRETE FINISHER | 27.18 | 18.11 | 45.29 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | 42.26 | 23.70 | 65.96 |
| PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | 49.43 | 24.36 | 73.79 |
| PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | 51.30 | 25.87 | 77.17 |
| PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (EXCLUDING TOWNSHIPS OF CLINTON, MACON, & TECUMSEH).$ 46.29 25.43 PIPEFITTER: HVAC PIPE INSTALLATION ONLY (EXCLUDING TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | 46.29 | 25.43 | 71.72 |
| PIPEFITTER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (EXCLUDING TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | 46.29 | 25.43 | 71.72 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 41.34 | 27.39 | 68.73 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | 30.80 | 21.51 | 52.31 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | 30.80 | 21.51 | 52.31 |
| TRUCK DRIVER: FLATBED TRUCK | 16.80 | 3.97 | 20.77 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | 15.50 | — | 15.50 |
| ROOFER | 15.73 | 7.41 | 23.14 |
| OPERATOR: TRACTOR | 19.60 | 7.31 | 26.91 |
| OPERATOR: ROLLER | 28.02 | 7.07 | 35.09 |
| OPERATOR: GRADER/BLADE | 24.04 | 6.03 | 30.07 |
| OPERATOR: BULLDOZER | 22.34 | 1.22 | 23.56 |
| OPERATOR: BACKHOE/EXCAVATOR | 29.04 | 9.76 | 38.80 |
| LABORER: LANDSCAPE & IRRIGATION | 12.84 | — | 12.84 |
| GLAZIER | 16.95 | 4.74 | 21.69 |
| FLOOR LAYER: CARPET | 19.59 | 7.57 | 27.16 |