Building Published 08/13/2026. 43 classifications. Covers 1 county: Huron
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 40.00 | 23.65 | 63.65 |
| BOILERMAKER | 43.50 | 37.64 | 81.14 |
| BRICKLAYER | 35.14 | 24.20 | 59.34 |
| PLASTERER | 33.09 | 26.58 | 59.67 |
| TILE SETTER | 31.43 | 21.13 | 52.56 |
| CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYER - CARPET) | 35.86 | 23.69 | 59.55 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, FORM WORK, METAL STUD INSTALLATION, AND LATHER DRYWALL HANGING) | 35.86 | 23.69 | 59.55 |
| MILLWRIGHT | 42.92 | 39.13 | 82.05 |
| ELECTRICIAN, LOW VOLTAGE WIRING ONLY (INSTALLER) | 30.12 | 14.57 | 44.69 |
| ELECTRICIAN, LOW VOLTAGE WIRING ONLY (TECHNICIAN) | 37.62 | 14.80 | 52.42 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | 51.32 | 28.44 | 79.76 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 47.28 | 25.25 | 72.53 |
| DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 43.93 | 25.25 | 69.18 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 41.28 | 25.25 | 66.53 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 33.71 | 25.25 | 58.96 |
| OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 31.23 | 25.25 | 56.48 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | 30.02 | 27.43 | 57.45 |
| IRONWORKER, REINFORCING | 36.55 | 33.37 | 69.92 |
| IRONWORKER, STRUCTURAL | 36.55 | 35.93 | 72.48 |
| LABORER: COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER | 26.20 | 13.45 | 39.65 |
| LABORER: SANDBLASTER | 26.73 | 13.45 | 40.18 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 23.79 | 12.02 | 35.81 |
| PAINTER: DRYWALL FINISHING/TAPING | 23.79 | 12.02 | 35.81 |
| CEMENT MASON/CONCRETE FINISHER | 25.47 | 12.38 | 37.85 |
| PIPEFITTER: EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING WEST OF M-53) | 47.00 | 24.18 | 71.18 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (PORTION OF HURON COUNTY LYING WEST OF M-53) | 47.00 | 24.18 | 71.18 |
| PLUMBER: EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING WEST OF M-53) | 47.00 | 24.18 | 71.18 |
| PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING EAST OF M-53) | 45.34 | 37.21 | 82.55 |
| PIPEFITTER: INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC SYSTEM INSTALLATION (PORTION OF HURON COUNTY LYING EAST OF M-53) | 45.96 | 43.90 | 89.86 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 41.34 | 27.39 | 68.73 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | 26.83 | 23.78 | 50.61 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | 26.83 | 23.78 | 50.61 |
| CARPENTER (FLOOR LAYING-CARPET ONLY) | 19.59 | 7.57 | 27.16 |
| GLAZIER | 16.95 | 4.74 | 21.69 |
| LABORER: LANDSCAPE & IRRIGATION | 12.84 | — | 12.84 |
| OPERATOR: BULLDOZER | 22.34 | 1.22 | 23.56 |
| OPERATOR: GRADER/BLADE | 24.04 | 6.03 | 30.07 |
| OPERATOR: ROLLER | 28.02 | 7.07 | 35.09 |
| OPERATOR: TRACTOR | 19.60 | 7.31 | 26.91 |
| ROOFER | 15.73 | 7.41 | 23.14 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | 15.65 | 3.12 | 18.77 |
| TRUCK DRIVER: FLATBED TRUCK | 16.80 | 3.97 | 20.77 |