Building Published 05/18/2026. 43 classifications. Covers 1 county: Allegan
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 43.50 | 37.64 | 81.14 |
| TILE SETTER (ALLEGAN COUNTY (TOWNSHIPS OF BRADLEY, DORR, GREEN LAKE, & HOPKINS)) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | 32.20 | 23.46 | 55.66 |
| BRICKLAYER (ALLEGAN COUNTY (TOWNSHIPS OF BRADLEY, DORR, GREEN LAKE, & HOPKINS)) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | 35.21 | 24.34 | 59.55 |
| TILE SETTER (TOWNSHIPS OF ALLEGAN, CASCO, CHESHIRE, CLYDE, GRANGES, GUN PLAIN, LEE, MARTIN, OTSEGO, TROWBRIDGE, VALLEY & WATSON) | 32.20 | 23.46 | 55.66 |
| BRICKLAYER (TOWNSHIPS OF ALLEGAN, CASCO, CHESHIRE, CLYDE, GRANGES, GUN PLAIN, LEE, MARTIN, OTSEGO, TROWBRIDGE, VALLEY & WATSON) | 35.21 | 24.34 | 59.55 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYER-CARPET) | 31.50 | 21.15 | 52.65 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION) | 31.50 | 21.15 | 52.65 |
| MILLWRIGHT | 40.04 | 26.47 | 66.51 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF ALLEGAN, CASCO, CHESHIRE, CLYDE, GANGES, GUN PLAIN, HEATH, HOPKINS, LEE, MANLIUS, MARTIN, MONTEREY, OTSEGO, SAUGATUCK, TROWBRIDGE, VALLEY, WATSON & WAYLAND) | 42.78 | 21.84 | 64.62 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF DORR, FILLMORE, LAKETON, LEIGHTON, OVERISEL, & SALEM) | 35.68 | 23.36 | 59.04 |
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 31.23 | 25.25 | 56.48 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 41.28 | 25.25 | 66.53 |
| POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 43.93 | 25.25 | 69.18 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 47.28 | 25.25 | 72.53 |
| IRONWORKER: STRUCTURAL | 36.55 | 29.51 | 66.06 |
| IRONWORKER: REINFORCING | 36.55 | 29.51 | 66.06 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | 30.02 | 27.43 | 57.45 |
| LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | 30.72 | 12.95 | 43.67 |
| LABORER : COMMON OR GENERAL; SANDBLASTER | 27.21 | 13.45 | 40.66 |
| PLASTERER | 21.18 | 12.43 | 33.61 |
| PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | 47.40 | 23.35 | 70.75 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | 47.40 | 23.35 | 70.75 |
| PIPEFITTER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | 47.40 | 23.35 | 70.75 |
| PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (EXCLUDES TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | 32.50 | 24.97 | 57.47 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (EXCLUDES TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | 32.50 | 24.97 | 57.47 |
| PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION (EXCLUDES TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM) | 32.50 | 24.97 | 57.47 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 41.34 | 27.39 | 68.73 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | 42.74 | 21.53 | 64.27 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | 42.74 | 21.53 | 64.27 |
| TRUCK DRIVER: FLATBED TRUCK | 16.80 | 3.97 | 20.77 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | 15.65 | 3.12 | 18.77 |
| ROOFER | 15.73 | 7.41 | 23.14 |
| OPERATOR: TRACTOR | 19.60 | 7.31 | 26.91 |
| OPERATOR: ROLLER | 28.02 | 7.07 | 35.09 |
| OPERATOR: GRADER/BLADE | 24.04 | 6.03 | 30.07 |
| OPERATOR: FORKLIFT | 15.31 | 4.47 | 19.78 |
| OPERATOR: BULLDOZER | 22.34 | 1.22 | 23.56 |
| LABORER: LANDSCAPE & IRRIGATION | 12.84 | — | 12.84 |
| GLAZIER | 16.95 | 4.74 | 21.69 |
| CEMENT MASON/CONCRETE FINISHER | 15.31 | 4.47 | 19.78 |
| CARPENTER (FLOOR LAYING-CARPET ONLY) | 19.59 | 7.57 | 27.16 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 19.82 | 7.31 | 27.13 |