Building Published 05/18/2026. 36 classifications. Covers 1 county: Alcona
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 40.00 | 23.65 | 63.65 |
| BOILERMAKER | 43.50 | 37.64 | 81.14 |
| TILE SETTER | 35.83 | 22.18 | 58.01 |
| CARPENTER (DRYWALL HANGER AND FORM WORK) | 30.83 | 21.09 | 51.92 |
| ELECTRICIAN | 37.75 | 25.60 | 63.35 |
| POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 31.23 | 25.25 | 56.48 |
| POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; LOADER; PAVER; ROLLER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 41.28 | 25.25 | 66.53 |
| POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 43.93 | 25.25 | 69.18 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 44.13 | 25.25 | 69.38 |
| IRONWORKER, STRUCTURAL | 36.55 | 35.93 | 72.48 |
| IRONWORKER, REINFORCING | 36.55 | 33.37 | 69.92 |
| LABORER: SANDBLASTER | 26.23 | 13.45 | 39.68 |
| LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER | 25.02 | 13.45 | 38.47 |
| PAINTER: BRUSH ONLY | 29.23 | 19.11 | 48.34 |
| CEMENT MASON/CONCRETE FINISHER | 23.10 | 12.38 | 35.48 |
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | 38.01 | 21.73 | 59.74 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION).$ 38.01 21.73 PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | 38.01 | 21.73 | 59.74 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | 38.01 | 21.73 | 59.74 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 41.34 | 27.39 | 68.73 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 26.83 | 23.78 | 50.61 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) | 31.05 | 25.07 | 56.12 |
| TRUCK DRIVER: FLATBED TRUCK | 17.44 | 4.51 | 21.95 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | 16.56 | 3.50 | 20.06 |
| ROOFER | 15.28 | 6.61 | 21.89 |
| PAINTER: SPRAY | 17.00 | 3.82 | 20.82 |
| PAINTER: ROLLER | 18.06 | 4.34 | 22.40 |
| OPERATOR: TRACTOR | 19.60 | 7.31 | 26.91 |
| OPERATOR: GRADER/BLADE | 24.04 | 6.03 | 30.07 |
| LABORER: MASON TENDER - BRICK | 14.89 | 3.10 | 17.99 |
| LABORER: LANDSCAPE & IRRIGATION | 14.63 | — | 14.63 |
| LABORER: COMMON OR GENERAL | 15.46 | 6.09 | 21.55 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | 20.63 | 5.80 | 26.43 |
| CARPENTER (METAL STUD INSTALLATION ONLY) | 14.80 | 4.86 | 19.66 |
| BRICKLAYER | 22.25 | 3.10 | 25.35 |