Building  Published 05/18/2026. 41 classifications. Covers 1 county: Washtenaw

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF ANN ARBOR, AUGUSTA, LODI, NORTHFIELD, PITTSFIELD, SALEM, SALINE, SCIO, SUPERIOR, WEBSTER, YPSILANTI & YORK)40.7432.5973.33
ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF BRIDGEWATER, DEXTER, FREEDOM, LIMS, LYNDON, MANCHESTER, SHARON & SYLVAN)40.0023.6563.65
BOILERMAKER43.5036.7480.24
TILE SETTER40.5323.6264.15
TILE FINISHER33.5023.5257.02
BRICKLAYER40.7128.2168.92
CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION42.4431.4373.87
CARPENTER (FLOOR LAYER - CARPET, RESILIENT, & VINYL FLOORING)36.7621.1157.87
MILLWRIGHT42.9239.1382.05
ELECTRICIAN56.0530.5286.57
FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE35.2925.3560.64
STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE43.6325.3568.98
FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE45.3425.3570.69
FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE46.3125.3571.66
TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE47.1725.3572.52
TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE47.9925.3573.34
TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE48.2925.3573.64
TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE48.7925.3574.14
TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE51.2925.3576.64
IRONWORKER: STRUCTURAL36.5535.9372.48
IRONWORKER: REINFORCING36.5533.3769.92
LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER27.719.1036.81
LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT)29.939.1039.03
LABORER: PIPELAYER38.4715.4553.92
LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE38.3315.4553.78
LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER38.1115.4553.56
PAINTER: SPRAY26.8617.6644.52
PAINTER: DRYWALL FINISHING/TAPING32.8520.4153.26
PAINTER: BRUSH AND ROLLER32.8520.4153.26
GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS WORKED THE LAST FULL REGULAR SCHEDULED WORK DAY PRIOR TO THE HOLIDAY, AND THE FIRST FULL REGULAR SCHEDULED WORK DAY FOLLOWING THE HOLIDAY, PROVIDED THE EMPLOYEE IS PHYSICALLY ABLE TO WORK42.0025.5567.55
CEMENT MASON/CONCRETE FINISHER32.2322.1154.34
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION51.3025.8777.17
PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION)51.3025.8777.17
ROOFER42.6721.6264.29
SPRINKLER FITTER (FIRE SPRINKLERS)53.5733.9587.52
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION42.5135.7778.28
TRUCK DRIVER: TRACTOR HAUL TRUCK13.571.1814.75
IRONWORKER, ORNAMENTAL18.487.9326.41
TRUCK DRIVER: GROUP 3 LOWBOY PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY31.280.7031.98
MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY31.180.7031.88
A. $456.70 PER WEEK, PLUS $67.10 PER DAY31.030.7031.73
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.