Building Published 08/13/2026. 43 classifications. Covers 1 county: St Clair
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 40.74 | 32.59 | 73.33 |
| BOILERMAKER | 43.50 | 36.74 | 80.24 |
| BRICKLAYER | 41.66 | 26.53 | 68.19 |
| TILE FINISHER | 33.50 | 23.52 | 57.02 |
| TILE SETTER | 40.53 | 23.62 | 64.15 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING) | 42.44 | 31.43 | 73.87 |
| CARPENTER (FLOOR LAYER - CARPET, RESILIENT, & VINYL FLOORING) | 36.76 | 21.11 | 57.87 |
| MILLWRIGHT | 42.92 | 39.13 | 82.05 |
| ELECTRICIAN | 51.32 | 28.54 | 79.86 |
| ELECTRICIAN, LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS (TECHNICIAN) | 39.93 | 17.97 | 57.90 |
| ELEVATOR MECHANIC FOOTNOTES: A. PAID HOLIDAYS NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY B. EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OF 6% BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | 65.01 | 38.44 | 103.45 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 51.29 | 25.35 | 76.64 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 48.79 | 25.35 | 74.14 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 48.29 | 25.35 | 73.64 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 47.99 | 25.35 | 73.34 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 47.17 | 25.35 | 72.52 |
| FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 46.31 | 25.35 | 71.66 |
| FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 45.34 | 25.35 | 70.69 |
| STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 43.63 | 25.35 | 68.98 |
| FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 35.29 | 25.35 | 60.64 |
| IRONWORKER: REINFORCING | 36.55 | 33.37 | 69.92 |
| IRONWORKER: STRUCTURAL | 36.55 | 35.93 | 72.48 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | 30.02 | 27.43 | 57.45 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS & CEILINGS) | 39.08 | 15.92 | 55.00 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | 29.93 | 9.10 | 39.03 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | 27.71 | 9.10 | 36.81 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE, PIPELAYER; SANDBLASTER | 31.30 | 18.40 | 49.70 |
| GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS WORKED THE LAST FULL REGULAR SCHEDULED WORK DAY PRIOR TO THE HOLIDAY, AND THE FIRST FULL REGULAR SCHEDULED WORK DAY FOLLOWING THE HOLIDAY, PROVIDED THE EMPLOYEE IS PHYSICALLY ABLE TO WORK | 42.00 | 25.55 | 67.55 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 23.79 | 12.02 | 35.81 |
| PAINTER: DRYWALL FINISHING/TAPING | 23.79 | 12.02 | 35.81 |
| PLASTERER | 30.63 | 14.07 | 44.70 |
| CEMENT MASON/CONCRETE FINISHER | 32.23 | 22.11 | 54.34 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | 45.34 | 37.21 | 82.55 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION | 45.96 | 43.90 | 89.86 |
| ROOFER | 30.38 | 19.87 | 50.25 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 41.34 | 27.39 | 68.73 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | 42.51 | 35.77 | 78.28 |
| INSTALLER - OVERHEAD DOOR | 27.98 | — | 27.98 |
| IRONWORKER, ORNAMENTAL | 18.48 | 7.93 | 26.41 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | 13.57 | 1.18 | 14.75 |
| A. $456.70 PER WEEK, PLUS $67.10 PER DAY | 31.03 | 0.70 | 31.73 |
| MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY | 31.18 | 0.70 | 31.88 |
| TRUCK DRIVER: GROUP 3 LOWBOY PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY | 31.28 | 0.70 | 31.98 |