Building Published 05/18/2026. 44 classifications. Covers 1 county: Newaygo
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 40.00 | 23.65 | 63.65 |
| BOILERMAKER | 43.50 | 36.74 | 80.24 |
| TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | 32.20 | 23.46 | 55.66 |
| TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | 27.94 | 21.15 | 49.09 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | 31.50 | 21.50 | 53.00 |
| MILLWRIGHT | 40.04 | 26.47 | 66.51 |
| OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 31.23 | 25.25 | 56.48 |
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 33.71 | 25.25 | 58.96 |
| DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER; STIFF LEG DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 41.28 | 25.25 | 66.53 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 43.93 | 25.25 | 69.18 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 47.28 | 25.25 | 72.53 |
| IRONWORKER, REINFORCING | 36.55 | 29.51 | 66.06 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | 28.56 | 12.95 | 41.51 |
| PAINTER: BRUSH AND SPRAY | 28.75 | 18.68 | 47.43 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | 47.40 | 23.35 | 70.75 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | 47.40 | 23.35 | 70.75 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | 35.41 | 15.86 | 51.27 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | 13.57 | 1.18 | 14.75 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | 17.00 | 5.71 | 22.71 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 17.88 | 4.73 | 22.61 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 22.28 | 7.95 | 30.23 |
| ROOFER | 13.86 | 6.11 | 19.97 |
| PAINTER: ROLLER | 16.21 | 2.81 | 19.02 |
| OPERATOR: LOADER | 17.16 | 4.05 | 21.21 |
| OPERATOR: TRACTOR | 15.72 | 1.92 | 17.64 |
| OPERATOR: BULLDOZER | 18.50 | 5.81 | 24.31 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 16.50 | 6.17 | 22.67 |
| LABORER: PIPELAYER | 18.32 | 3.28 | 21.60 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 14.01 | 2.45 | 16.46 |
| LABORER: MASON TENDER - BRICK | 18.87 | 2.16 | 21.03 |
| LABORER: LANDSCAPE & IRRIGATION | 10.47 | — | 10.47 |
| IRONWORKER, STRUCTURAL | 18.13 | 4.88 | 23.01 |
| IRONWORKER, ORNAMENTAL | 18.48 | 7.93 | 26.41 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | 16.75 | 2.75 | 19.50 |
| GLAZIER | 15.29 | 2.68 | 17.97 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | 21.34 | 6.81 | 28.15 |
| DRYWALL FINISHER/TAPER | 15.91 | 2.92 | 18.83 |
| CEMENT MASON/CONCRETE FINISHER | 17.16 | 4.25 | 21.41 |
| CARPENTER (FORM WORK ONLY) | 18.62 | 6.42 | 25.04 |
| CARPENTER (DRYWALL HANGING ONLY) | 17.26 | 2.69 | 19.95 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 18.49 | 2.69 | 21.18 |
| BRICKLAYER | 21.45 | 5.00 | 26.45 |