Building Published 05/18/2026. 47 classifications. Covers 1 county: Ionia
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 40.00 | 23.65 | 63.65 |
| BOILERMAKER | 43.50 | 36.74 | 80.24 |
| TILE SETTER | 32.20 | 23.46 | 55.66 |
| TILE FINISHER | 27.94 | 21.15 | 49.09 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK (EXCLUDING TOWNSHIPS OF DANBY, ORANGE, PORTLAND & SEBEWA) | 28.29 | 21.42 | 49.71 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK (TOWNSHIPS OF DANBY, ORANGE, PORTLAND & SEBEWA) | 36.21 | 20.91 | 57.12 |
| MILLWRIGHT | 40.04 | 26.47 | 66.51 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF BERLIN, BOSTON, CAMPBELL, EASTON, IONIA, KEENE, LYONS, NORTH PLAINS, ODESSA, ORLEANS, OTISCO & RONALD) | 36.52 | 25.15 | 61.67 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF ORANGE, PORTLAND, SEBEWA AND DANBY) | 42.98 | 29.75 | 72.73 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 31.23 | 25.25 | 56.48 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 33.71 | 25.25 | 58.96 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 41.28 | 25.25 | 66.53 |
| IRONWORKER, REINFORCING | 36.55 | 29.51 | 66.06 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (EXCLUDING THE CITY OF PORTLAND) | 24.90 | 12.95 | 37.85 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (CITY OF PORTLAND) | 32.53 | 13.45 | 45.98 |
| PAINTER: BRUSH AND SPRAY | 28.75 | 18.68 | 47.43 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (REMAINDER OF COUNTY) | 47.40 | 23.35 | 70.75 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (REMAINDER OF COUNTY) | 47.40 | 23.35 | 70.75 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (TOWNSHIPS OF DANBY & PORTLAND) FOOTNOTE PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | 46.29 | 25.43 | 71.72 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | 46.29 | 25.43 | 71.72 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | 42.74 | 21.53 | 64.27 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | 13.57 | 1.18 | 14.75 |
| TRUCK DRIVER: DUMP TRUCK | 17.00 | 5.71 | 22.71 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 17.88 | 4.73 | 22.61 |
| ROOFER | 13.86 | 6.11 | 19.97 |
| PAINTER: ROLLER | 16.21 | 2.81 | 19.02 |
| OPERATOR: LOADER | 17.16 | 4.05 | 21.21 |
| OPERATOR: TRACTOR | 15.72 | 1.92 | 17.64 |
| OPERATOR: CRANE | 19.28 | 7.55 | 26.83 |
| OPERATOR: BULLDOZER | 18.50 | 5.81 | 24.31 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 16.50 | 6.17 | 22.67 |
| LABORER: PIPELAYER | 18.32 | 3.28 | 21.60 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 14.01 | 2.45 | 16.46 |
| LABORER: MASON TENDER - BRICK | 18.87 | 2.16 | 21.03 |
| LABORER: LANDSCAPE & IRRIGATION | 10.47 | — | 10.47 |
| IRONWORKER, STRUCTURAL | 18.13 | 4.88 | 23.01 |
| IRONWORKER, ORNAMENTAL | 18.48 | 7.93 | 26.41 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | 16.75 | 2.75 | 19.50 |
| GLAZIER | 15.29 | 2.68 | 17.97 |
| DRYWALL FINISHER/TAPER | 15.91 | 2.92 | 18.83 |
| CEMENT MASON/CONCRETE FINISHER | 17.16 | 4.25 | 21.41 |
| CARPENTER (FORM WORK ONLY) | 18.62 | 6.42 | 25.04 |
| CARPENTER (DRYWALL HANGING ONLY) | 17.26 | 2.69 | 19.95 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 18.49 | 2.69 | 21.18 |
| BRICKLAYER | 21.45 | 5.00 | 26.45 |