Heavy Published 05/18/2026. 30 classifications. Covers 2 counties: Iron, Marquette
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 34.19 | 24.65 | 58.84 |
| CARPENTER, INCLUDES FORM WORK | 34.01 | 23.14 | 57.15 |
| ELECTRICIAN: ELECTRICAL CONTRACTS OVER $180,000 (IRON COUNTY) | 33.94 | 21.80 | 55.74 |
| ELECTRICIAN: ELECTRICAL CONTRACTS OF $180,000 OR LESS (IRON COUNTY) | 31.75 | 21.73 | 53.48 |
| ELECTRICIAN: CONTRACTS OVER $135,000 (MARQUETTE COUNTY) | 33.44 | 18.67 | 52.11 |
| ELECTRICIAN: CONTRACTS $135,000 AND UNDER (MARQUETTE COUNTY) | 31.44 | 18.59 | 50.03 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | 39.95 | 25.25 | 65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | 40.52 | 25.25 | 65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | 41.25 | 25.25 | 66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | 45.98 | 25.25 | 71.23 |
| OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | 44.92 | 25.00 | 69.92 |
| OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | 44.63 | 25.00 | 69.63 |
| OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | 43.81 | 25.00 | 68.81 |
| OPERATOR POWER EQUIPMENT: GROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | 35.86 | 12.50 | 48.36 |
| OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK (NON-SWING) EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | 37.26 | 25.00 | 62.26 |
| OPERATOR POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | 40.51 | 25.00 | 65.51 |
| IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | 41.05 | 33.67 | 74.72 |
| IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS $10,000,000 OR GREATER) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | 41.05 | 33.67 | 74.72 |
| LABORER ((5) PIPELAYER) | 21.56 | 12.85 | 34.41 |
| LABORER ((4) GRADE CHECKER) | 21.51 | 12.85 | 34.36 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | 21.33 | 12.85 | 34.18 |
| LABORER ((1) COMMON OR GENERAL) | 21.19 | 12.85 | 34.04 |
| CEMENT MASON/CONCRETE FINISHER | 20.17 | 10.13 | 30.30 |
| PLUMBER/PIPEFITTER | 34.48 | 25.18 | 59.66 |
| TRUCK DRIVER: DUMP TRUCK | 12.63 | 1.25 | 13.88 |
| OPERATOR: ROLLER | 13.74 | 7.93 | 21.67 |
| OPERATOR: GRADER/BLADE | 16.63 | 5.85 | 22.48 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 12.98 | 6.12 | 19.10 |
| LABORER: LANDSCAPE | 10.89 | 1.74 | 12.63 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | 33.55 | 0.75 | 34.30 |