Heavy  Published 05/18/2026. 31 classifications. Covers 8 counties: Baraga, Houghton, Keweenaw, Luce, Mackinac, Menominee, Ontonagon, Schoolcraft

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
BRICKLAYER34.1924.6558.84
AT AMBERG, WISCONSIN, STARTING ON THE WEST AT THE MENOMINEE RIVER AND ENDING ON THE EAST AT THE BAY OF GREEN BAY)34.0123.1457.15
ELECTRICIAN (MENOMINEE COUNTY (TOWNSHIPS OF INGALLSTON, MELON & MENOMINEE))40.2523.1463.39
ELECTRICIAN: ELECTRICAL CONTRACTS OVER $180,000 (BARAGA, HOUGHTON, KEWEENAW AND ONTONAGON COUNTIES).$ 33.94 21.80 ELECTRICIAN: ELECTRICAL CONTRACTS OF $180,000 OR LESS (BARAGA, HOUGHTON, KEWEENAW AND ONTONAGON COUNTIES)31.7521.7353.48
ELECTRICIAN (MENOMINEE (EXCEPT THE TOWNSHIPS OF INGALLSTON, MELLON & MENOMINEE) & SCHOOLCRAFT COUNTIES)33.4321.7855.21
ELECTRICIAN: CONTRACTS OVER $135,000 (LUCE & MACKINAC COUNTIES)33.4418.6752.11
ELECTRICIAN: CONTRACTS $135,000 AND UNDER (LUCE & MACKINAC COUNTIES)31.4418.5950.03
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR39.9525.2565.20
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)40.5225.2565.77
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)41.2525.2566.50
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)45.9825.2571.23
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE44.9225.0069.92
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE44.6325.0069.63
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE43.8125.0068.81
OPERATOR POWER EQUIPMENT: GROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE35.8612.5048.36
OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK (NON-SWING) EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE37.2625.0062.26
OPERATOR POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE40.5125.0065.51
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY41.0533.6774.72
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS $10,000,000 OR GREATER) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY41.0533.6774.72
LABORER ((5) PIPELAYER)21.5612.8534.41
LABORER ((4) GRADE CHECKER)21.5112.8534.36
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)21.3312.8534.18
LABORER ((1) COMMON OR GENERAL)21.1912.8534.04
CEMENT MASON/CONCRETE FINISHER20.1710.1330.30
PLUMBER/PIPEFITTER34.4825.1859.66
TRUCK DRIVER: DUMP TRUCK12.631.2513.88
OPERATOR: ROLLER13.747.9321.67
OPERATOR: GRADER/BLADE16.635.8522.48
OPERATOR: BOBCAT/SKID STEER/SKID LOADER12.986.1219.10
LABORER: LANDSCAPE10.891.7412.63
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY33.550.7534.30
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.