MI20260036 rev 1

Heavy  Published 05/18/2026. 28 classifications. Covers 1 county: Gogebic

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
BRICKLAYER34.1924.6558.84
CARPENTER, INCLUDES FORM WORK34.0123.1457.15
ELECTRICIAN (ELECTRICAL CONTRACTS OVER $180,000)33.9421.8055.74
ELECTRICIAN (ELECTRICAL CONTRACTS OF $180,000 OR LESS)31.7521.7353.48
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR39.9525.2565.20
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)40.5225.2565.77
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)41.2525.2566.50
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, BULLDOZER, CRANE, LOADER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)45.9825.2571.23
OPERATOR: POWER EQUIPMENT: GROUP 1 BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE40.5125.0065.51
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE44.9225.0069.92
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE44.6325.0069.63
OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK (NON-SWING) EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE37.2625.0062.26
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY41.0533.6774.72
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS $10,000,000 OR GREATER) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY41.0533.6774.72
LABORER ((4) GRADE CHECKER)22.9612.9535.91
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)22.7812.9535.73
LABORER: MASON TENDER - CEMENT/CONCRETE (EXCLUDES OPEN CUT CONSTRUCTION)32.7413.4546.19
CEMENT MASON/CONCRETE FINISHER20.1710.1330.30
PLUMBER/PIPEFITTER34.4825.1859.66
TRUCK DRIVER: DUMP TRUCK12.631.2513.88
OPERATOR: ROLLER13.747.9321.67
OPERATOR: GRADER/BLADE16.635.8522.48
OPERATOR: BOBCAT/SKID STEER/SKID LOADER12.986.1219.10
OPERATOR: BACKHOE/EXCAVATOR15.613.5819.19
LABORER: PIPELAYER12.501.0613.56
LABORER: LANDSCAPE10.891.7412.63
LABORER: COMMON OR GENERAL14.713.3518.06
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY33.550.7534.30
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.