Highway Published 05/18/2026. 25 classifications. Covers 1 county: Sagadahoc
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | 17.27 | 2.62 | 19.89 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 17.02 | 5.37 | 22.39 |
| TRAFFIC CONTROL: FLAGGER | 10.33 | — | 10.33 |
| OPERATOR: ROLLER ASPHALT | 19.38 | 4.59 | 23.97 |
| OPERATOR: ROLLER (EARTH) | 16.52 | 1.66 | 18.18 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 20.26 | 4.61 | 24.87 |
| OPERATOR: MILLING MACHINE | 28.51 | 5.44 | 33.95 |
| OPERATOR: MECHANIC | 24.69 | 8.18 | 32.87 |
| OPERATOR: LOADER | 19.52 | 3.19 | 22.71 |
| OPERATOR: GRADER/BLADE | 27.40 | 8.13 | 35.53 |
| OPERATOR: BULLDOZER | 21.71 | 5.67 | 27.38 |
| OPERATOR: BROOM/SWEEPER | 19.02 | — | 19.02 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 22.21 | 1.90 | 24.11 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 20.67 | 3.91 | 24.58 |
| LABORER: WHEELMAN | 21.28 | 4.02 | 25.30 |
| LABORER: EPOXY INJECTOR (CONCRETE) | 13.43 | 1.15 | 14.58 |
| LABORER: COMMON OR GENERAL | 15.06 | 2.09 | 17.15 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 17.30 | 1.76 | 19.06 |
| IRONWORKER, STRUCTURAL | 22.33 | 4.50 | 26.83 |
| IRONWORKER, REINFORCING | 21.85 | — | 21.85 |
| INSTALLER - GUARDRAIL | 19.98 | 2.55 | 22.53 |
| HIGHWAY/PARKING LOT STRIPING: LABORER | 15.53 | 2.04 | 17.57 |
| ELECTRICIAN | 25.21 | 5.63 | 30.84 |
| CEMENT MASON/CONCRETE FINISHER | 19.27 | 1.13 | 20.40 |
| CARPENTER, INCLUDES FORM WORK | 18.95 | 3.23 | 22.18 |