Highway Published 05/18/2026. 26 classifications. Covers 1 county: Suffolk
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION) | 66.17 | 37.08 | 103.25 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | 57.18 | 33.70 | 90.88 |
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BROOM/SWEEPER; CRANE; GRADALL; LOADER; PAVER (ASPHALT, AGGREGATE, AND CONCRETE); POST DRIVER (GUARDRAIL/FENCES) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | 57.83 | 33.70 | 91.53 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | 57.87 | 37.67 | 95.54 |
| LABORER: FENCE ERECTION | 46.20 | 29.70 | 75.90 |
| LABORER (LANDSCAPE) | 46.20 | 29.70 | 75.90 |
| LABORER (GUARDRAIL INSTALLATION) | 46.20 | 29.70 | 75.90 |
| LABORER: CONCRETE SURFACER | 46.20 | 29.85 | 76.05 |
| PAINTER: STEEL | 56.76 | 36.00 | 92.76 |
| TRUCK DRIVER: FLATBED TRUCK | 48.53 | — | 48.53 |
| TRUCK DRIVER: DUMP TRUCK | 37.74 | 11.86 | 49.60 |
| TRUCK DRIVER: CONCRETE TRUCK | 33.69 | 15.79 | 49.48 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 53.35 | 12.78 | 66.13 |
| TRAFFIC CONTROL: FLAGGER | 23.00 | 20.44 | 43.44 |
| PAINTER: SPRAY (LINESTRIPING) | 47.30 | 6.42 | 53.72 |
| OPERATOR: PILEDRIVER | 42.56 | 17.34 | 59.90 |
| OPERATOR: MECHANIC | 48.74 | 11.79 | 60.53 |
| OPERATOR: FORKLIFT | 64.67 | — | 64.67 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 64.67 | 15.70 | 80.37 |
| LABORER: JACK HAMMER | 38.69 | 17.33 | 56.02 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | 44.43 | 14.18 | 58.61 |
| LABORER: COMMON OR GENERAL | 44.97 | 16.07 | 61.04 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 33.65 | 17.32 | 50.97 |
| IRONWORKER, REINFORCING | 57.39 | 19.17 | 76.56 |
| CEMENT MASON/CONCRETE FINISHER | 56.70 | 21.08 | 77.78 |
| CARPENTER, INCLUDES FORM WORK | 66.59 | 15.41 | 82.00 |