Highway Published 05/18/2026. 24 classifications. Covers 1 county: Middlesex
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 66.17 | 37.08 | 103.25 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | 57.18 | 33.70 | 90.88 |
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; GRADALL; LOADER; PAVER (ASPHALT, AGGREGATE, AND CONCRETE) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | 57.83 | 33.70 | 91.53 |
| IRONWORKER (ORNAMENTAL, REINFORCING, AND STRUCTURAL) | 57.87 | 37.67 | 95.54 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 33.50 | 22.92 | 56.42 |
| LABORER (LANDSCAPE) | 33.25 | 22.92 | 56.17 |
| PAINTER: STEEL | 56.76 | 36.00 | 92.76 |
| TRUCK DRIVER: FLATBED TRUCK | 48.53 | — | 48.53 |
| TRUCK DRIVER: DUMP TRUCK | 38.92 | 9.73 | 48.65 |
| TRUCK DRIVER: CONCRETE TRUCK | 33.69 | 15.79 | 49.48 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 44.49 | 12.41 | 56.90 |
| TRAFFIC CONTROL: FLAGGER | 23.00 | 20.44 | 43.44 |
| PILEDRIVERMAN | 45.65 | 23.33 | 68.98 |
| PAINTER: SPRAY (LINESTRIPING) | 40.87 | 13.86 | 54.73 |
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) | 41.49 | 23.07 | 64.56 |
| OPERATOR: PILEDRIVER | 44.46 | 16.94 | 61.40 |
| OPERATOR: MECHANIC | 48.14 | 17.02 | 65.16 |
| OPERATOR: FORKLIFT | 64.67 | — | 64.67 |
| OPERATOR: CRANE | 57.61 | — | 57.61 |
| LABORER: GUARDRAIL INSTALLATION | 37.70 | 15.37 | 53.07 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | 41.78 | 18.37 | 60.15 |
| LABORER: COMMON OR GENERAL | 36.58 | 19.40 | 55.98 |
| CEMENT MASON/CONCRETE FINISHER | 56.70 | 21.08 | 77.78 |
| CARPENTER, INCLUDES FORM WORK | 47.93 | 19.46 | 67.39 |