Residential Published 05/18/2026. 49 classifications. Covers 2 counties: Dukes, Nantucket
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 50.62 | 28.82 | 79.44 |
| TERRAZZO FINISHER | 63.44 | 37.33 | 100.77 |
| MARBLE, TILE & TERRAZZO WORKERS | 64.52 | 37.51 | 102.03 |
| MARBLE & TILE FINISHER | 49.32 | 35.26 | 84.58 |
| BRICKLAYER, CEMENT MASON, PLASTERER (NEW BEDFORD CHAPTER) | 64.50 | 37.54 | 102.04 |
| CARPENTERS: (ALL OTHER WORK) | 50.10 | 31.45 | 81.55 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: WOOD FRAMING, SIDING AND EXTERIOR TRIM WORK (DUKES COUNTY) | 26.55 | 13.02 | 39.57 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: ALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS (DUKES COUNTY) | 26.55 | 13.02 | 39.57 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: WOOD FRAMING, SIDING AND EXTERIOR TRIM WORK (NANTUCKET COUNTY) | 26.55 | 13.02 | 39.57 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: ALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS (NANTUCKET COUNTY) | 26.55 | 13.02 | 39.57 |
| FLOOR LAYER: CARPET | 49.18 | 31.75 | 80.93 |
| ELECTRICIAN | 50.02 | 31.05 | 81.07 |
| ELEVATOR MECHANIC FOOTNOTE FOR ELEVATOR MECHANICS: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | 74.17 | 38.44 | 112.61 |
| POWER EQUIPMENT OPERATORS: GROUP 6 OILER (ON TRUCK CRANES AND GRADALLS) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB) OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | 30.85 | 33.70 | 64.55 |
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT +13.14 | 25.02 | 33.70 | 58.72 |
| POWER EQUIPMENT OPERATORS: GROUP 4 ASSISTANT ENGINEER (FIREMAN) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB) OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | 46.52 | 33.70 | 80.22 |
| POWER EQUIPMENT OPERATORS: GROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINE (1-3 GROUPED); GENERATOR; CONCRETE VIBRATOR; HEATER (POWER DRIVEN 1- 5); WELL POINT SYSTEM (OPERATING); SYPHON-PULSOMETER; CONCRETE MIXER; VALVES CONTROLLING PERMANENT PLANT AIR OR STEAM; CONVEYOR; JACKSON TYPE TAMPER; SINGLE DIAPHRAGM PUMP; LIGHTING PLANT FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB) OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | 37.02 | 33.70 | 70.72 |
| POWER EQUIPMENT OPERATORS: GROUP 1 CRANE; SHOVEL; TRUCK CRANE; CHERRY PICKER; DRAGLINE; TRENCH HOE; BACKHOE; THREE DRUM MACHINE; DERRICK; PILE DRIVER; ELEVATOR TOWER; HOIST; GRADALL; SHOVEL DOZER; FRONT END LOADER; FORK LIFT; BORING MACHINE; ROTARY DRILL; POST HOLE HAMMER; POST HOLE DIGGER; PUMPCRETE MACHINE; ASPHALT PLANT (ON SITE); CONCRETE BATCHING AND/OR MIXING PLANT (ON SITE); CRUSHER PLANT (ON SITE); PAVING CONCRETE MIXER; TIMBER JACK FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB) OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | 57.83 | 33.70 | 91.53 |
| POWER EQUIPMENT OPERATORS: OOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT +13.14 | 57.18 | 33.70 | 90.88 |
| IRONWORKER | 43.03 | 33.53 | 76.56 |
| LABORERS: GROUP 7 FLAGGERS | 27.01 | 29.70 | 56.71 |
| LABORERS: GROUP 6 ASBESTOS REMOVAL LABORERS | 46.10 | 29.70 | 75.80 |
| LABORERS: GROUP 5 PRE-CAST FLOOR AND ROOF PLANK ERECTOR | 38.95 | 29.70 | 68.65 |
| LABORERS: GROUP 4 BLASTER; POWDERMAN | 38.95 | 29.70 | 68.65 |
| LABORERS: GROUP 3 AIR TRACK, BLOCK PAVER; RUMMER; CURB SETTER; HYDRAULIC AND SIMILAR SELF POWERED DRILLS | 38.95 | 29.70 | 68.65 |
| LABORERS: GROUP 2 JACKHAMMER OPERATOR; PAVEMENT BREAKER; ASPHAL RAKER CARBIDE CORE DRILLING MACHINE; CHAIN SAW OPERTOR; PIPELAYER; BARCO TYPE JUMPING TAMPERS; LASER BEAM; CONCRETE PUMP; MASON TENDER; MOTORIZED MORTAR MIXER; RIDE-ON MOTORIZED BUGGY; FENCE AND BEAM RAIL ERECTOR | 38.95 | 29.70 | 68.65 |
| LABORERS: GROUP 1 LABORERS; CARPENTER TENDERS | 38.95 | 29.70 | 68.65 |
| LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE | 46.25 | 29.70 | 75.95 |
| LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS | 45.35 | 29.70 | 75.05 |
| LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY) | 42.25 | 29.70 | 71.95 |
| LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC ""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS | 47.25 | 29.70 | 76.95 |
| LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS | 47.00 | 29.70 | 76.70 |
| LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER | 46.25 | 29.70 | 75.95 |
| GLAZIER FOOTNOTE: A. PAID HOLIDAY: LABOR DAY, PROVIDED EMPLOYEE HAS WORKED ANY PART OF THE WEEK PRIOR TO LABOR DAY AND PART OF THE WEEK AFTER LABOR DAY | 43.13 | 21.00 | 64.13 |
| PAINTERS: SPRAY, SANDBLAST (REPAINT) | 45.72 | 36.00 | 81.72 |
| PAINTERS: SPRAY, SANDBLAST (NEW CONSTRUCTION) | 47.66 | 36.00 | 83.66 |
| PAINTERS: BRUSH, TAPER (REPAINT) | 44.32 | 36.00 | 80.32 |
| PAINTERS: BRUSH, TAPER (NEW CONSTRUCTION) | 46.26 | 36.00 | 82.26 |
| PLUMBERS AND PIPEFITTERS | 52.49 | 33.60 | 86.09 |
| ROOFERS: (ALL TEAR-OFF AND/OR REMOVAL OF ANY TYPES OF ROOFING AND ALL SPUDDING, SWEEPING, VACUUMING AND/OR CLEANUP OF ANY AND ALL AREAS OF ANY TYPE WHERE A ROOF IS TO BE RELAID) | 53.53 | 35.69 | 89.22 |
| SPRINKLER FITTER (BARNSTABLE; BRISTOL (BEYOND 35 MI RADIUS OF BOSTON CITY HALL); DUKES; MIDDLESEX (ASHBY, TOWNSEND, THE AREA OF PEPPERELL AND SHIRLEY BEYOND 35 MI RADIUS OF BOSTON CITY HALL); NANTUCKET; PLYMOUTH (BEYOND 35 MI RADIUS OF BOSTON CITY HALL)) | 49.70 | 29.75 | 79.45 |
| SPRINKLER FITTER | 49.70 | 29.75 | 79.45 |
| TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 41.82 | 37.35 | 79.17 |
| TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 41.53 | 37.35 | 78.88 |
| TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 41.24 | 37.35 | 78.59 |
| TRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 41.14 | 37.35 | 78.49 |
| TRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 41.02 | 37.35 | 78.37 |
| TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 40.95 | 37.35 | 78.30 |
| TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 40.78 | 37.35 | 78.13 |