Building Published 05/18/2026. 25 classifications. Covers 1 county: Jefferson
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 32.66 | 9.86 | 42.52 |
| ELECTRICIAN (INCLUDING COMMUNICATION TECHNICIAN AND LOW VOLTAGE WIRING; EXCLUDING INSTALLATION OF HVAC/TEMPERATURE CONTROLS) | 36.00 | 16.66 | 52.66 |
| ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY. B. VACATION EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR UNDER 5 YEARS OF SERVICE AS VACATION PAY CREDIT | 51.11 | 38.44 | 89.55 |
| POWER EQUIPMENT OPERATOR: CRANE CRANE PREMIUMS 50-150 TONS $1.75 OVER 150 TONS $2.25 | 23.46 | 8.35 | 31.81 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | 34.75 | 13.86 | 48.61 |
| GLAZIER | 25.44 | 12.20 | 37.64 |
| PAINTER (SPRAY) | 18.83 | 9.48 | 28.31 |
| CEMENT MASON/CONCRETE FINISHER | 30.47 | 7.97 | 38.44 |
| PIPEFITTER (INCLUDING HVAC UNIT INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION) | 33.30 | 14.98 | 48.28 |
| PLUMBER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC UNIT INSTALLATION) | 34.87 | 17.79 | 52.66 |
| TRUCK DRIVER: DUMP TRUCK | 15.00 | — | 15.00 |
| TILE SETTER | 20.00 | — | 20.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 20.98 | 5.46 | 26.44 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 20.66 0.00 SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 25.54 | 10.30 | 35.84 |
| ROOFER | 16.77 | 5.66 | 22.43 |
| PAINTER: DRYWALL FINISHING/TAPING | 18.63 | 3.43 | 22.06 |
| PAINTER (BRUSH AND ROLLER), EXCLUDES DRYWALL FINISHING/TAPING | 18.95 | 8.91 | 27.86 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 21.03 | — | 21.03 |
| LABORER: MASON TENDER - BRICK | 12.39 | — | 12.39 |
| LABORER: COMMON OR GENERAL | 14.68 | — | 14.68 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | 28.93 | 6.31 | 35.24 |
| DRYWALL HANGER AND METAL STUD INSTALLER | 18.35 | 4.33 | 22.68 |
| CARPENTER, EXCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, AND FORM WORK | 18.45 | 3.18 | 21.63 |
| CARPENTER (FORM WORK ONLY) | 15.00 | — | 15.00 |
| BRICKLAYER | 18.88 | — | 18.88 |