Building Published 05/18/2026. 36 classifications. Covers 2 counties: Boyd, Greenup
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 35.23 | 23.04 | 58.27 |
| BOILERMAKER | 43.85 | 28.44 | 72.29 |
| INDUSTRIAL: BRICKLAYER - REFRACTORY BRICK REPLACEMENT | 41.05 | 21.79 | 62.84 |
| BRICKLAYER | 35.00 | 17.13 | 52.13 |
| CARPENTER | 37.04 | 26.57 | 63.61 |
| ELECTRICIAN | 41.15 | 29.35 | 70.50 |
| POWER EQUIPMENT OPERATOR (DRILL) | 40.65 | 19.60 | 60.25 |
| POWER EQUIPMENT OPERATOR: LOADER | 40.65 | 19.60 | 60.25 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | 41.98 | 19.60 | 61.58 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 41.98 | 19.60 | 61.58 |
| POWER EQUIPMENT OPERATOR (OILER) | 34.99 | 19.60 | 54.59 |
| IRONWORKER: ORNAMENTAL | 37.77 | 23.90 | 61.67 |
| LABORER: POWER TOOL OPERATOR | 31.35 | 23.18 | 54.53 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 31.20 | 23.18 | 54.38 |
| LABORER: FIRE WATCH | 31.20 | 23.18 | 54.38 |
| PAINTER: BRUSH AND ROLLER | 31.96 | 23.95 | 55.91 |
| CEMENT MASON/CONCRETE FINISHER | 33.60 | 16.05 | 49.65 |
| PIPEFITTER | 42.75 | 25.76 | 68.51 |
| PLUMBER | 41.00 | 21.66 | 62.66 |
| ROOFER | 34.38 | 19.94 | 54.32 |
| SPRINKLER FITTER | 44.15 | 26.08 | 70.23 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 33.53 | 26.71 | 60.24 |
| TRUCK DRIVER: DUMP TRUCK | 24.35 | 14.59 | 38.94 |
| PAINTER: SPRAY | 22.81 | 11.87 | 34.68 |
| OPERATOR: ROLLER | 23.60 | 12.65 | 36.25 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 22.52 | 4.00 | 26.52 |
| OPERATOR: BULLDOZER | 19.69 | 4.71 | 24.40 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 24.66 | 10.81 | 35.47 |
| LABORER: PIPELAYER | 20.36 | 9.90 | 30.26 |
| LABORER: MASON TENDER - BRICK | 21.86 | 9.31 | 31.17 |
| LABORER: COMMON OR GENERAL | 23.27 | 13.67 | 36.94 |
| IRONWORKER, STRUCTURAL | 25.62 | 18.01 | 43.63 |
| IRONWORKER, REINFORCING | 28.38 | 16.89 | 45.27 |
| BRICKLAYER: TILE SETTER | 35.11 | 18.26 | 53.37 |
| BRICKLAYER: TILE FINISHER | 35.40 | 17.66 | 53.06 |
| LABORER: CARPENTER TENDER | 30.95 | 21.83 | 52.78 |