Building Published 05/18/2026. 34 classifications. Covers 4 counties: Allen, Butler, Edmonson, Warren
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 43.85 | 28.44 | 72.29 |
| ELECTRICIAN | 40.96 | 22.44 | 63.40 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | 40.65 | 19.60 | 60.25 |
| POWER EQUIPMENT OPERATOR (DRILL) | 40.65 | 19.60 | 60.25 |
| POWER EQUIPMENT OPERATOR: LOADER | 40.65 | 19.60 | 60.25 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 40.65 | 19.60 | 60.25 |
| POWER EQUIPMENT OPERATOR (OILER) | 34.99 | 19.60 | 54.59 |
| IRONWORKER: ORNAMENTAL | 37.77 | 23.90 | 61.67 |
| LABORER: MASON TENDER - BRICK | 28.89 | 19.20 | 48.09 |
| LABORER: POWER TOOL OPERATOR | 31.35 | 23.18 | 54.53 |
| PAINTER: SPRAY FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | 30.62 | 20.30 | 50.92 |
| PLUMBER | 44.26 | 20.28 | 64.54 |
| PIPEFITTER | 38.41 | 22.26 | 60.67 |
| ROOFER | 30.97 | 13.91 | 44.88 |
| SPRINKLER FITTER | 44.15 | 26.08 | 70.23 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 40.19 | 27.33 | 67.52 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | 40.32 | 25.66 | 65.98 |
| TRUCK DRIVER: DUMP TRUCK | 23.60 | 8.03 | 31.63 |
| TILE SETTER | 20.96 | — | 20.96 |
| TILE FINISHER | 15.42 | 7.24 | 22.66 |
| PAINTER (BRUSH AND ROLLER) | 18.79 | 5.88 | 24.67 |
| OPERATOR: ROLLER | 23.60 | 12.65 | 36.25 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 22.52 | 4.00 | 26.52 |
| OPERATOR: BULLDOZER | 24.51 | 12.72 | 37.23 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 26.40 | 9.60 | 36.00 |
| LABORER: PIPELAYER | 15.00 | 4.08 | 19.08 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 14.28 | 8.95 | 23.23 |
| LABORER: COMMON OR GENERAL | 12.50 | — | 12.50 |
| IRONWORKER, STRUCTURAL | 25.41 | 7.63 | 33.04 |
| IRONWORKER, REINFORCING | 27.31 | 16.86 | 44.17 |
| CEMENT MASON/CONCRETE FINISHER | 20.56 | 9.56 | 30.12 |
| CARPENTER, INCLUDES FORM WORK | 18.67 | — | 18.67 |
| BRICKLAYER | 25.09 | 10.05 | 35.14 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 30.94 | 21.99 | 52.93 |