Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

KS20260156 rev 1

Heavy  Published 05/18/2026. 17 classifications. Covers 1 county: Miami

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
CARPENTER43.2821.2564.53
ELECTRICIAN40.6418.2958.93
LINE CONSTRUCTION: LINEMAN53.6826.4480.12
POWER EQUIPMENT OPERATOR: ROLLER40.1722.2962.46
POWER EQUIPMENT OPERATOR: LOADER40.1722.2962.46
POWER EQUIPMENT OPERATOR: GRADER/BLADE40.1722.2962.46
POWER EQUIPMENT OPERATOR: FORKLIFT40.1722.2962.46
POWER EQUIPMENT OPERATOR: BULLDOZER40.1722.2962.46
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER40.1722.2962.46
POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE40.1722.2962.46
IRONWORKER39.0034.2573.25
LABORER: PIPELAYER36.2415.8752.11
CEMENT MASON/CONCRETE FINISHER39.0618.7157.77
TRUCK DRIVER: DUMP TRUCK32.9519.4952.44
OPERATOR: CRANE34.4111.2245.63
LABORER: COMMON OR GENERAL20.643.6624.30
CARPENTER, EXCLUDES FORM WORK20.653.8024.45
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.