Highway Published 05/18/2026. 38 classifications. Covers 1 county: Butler
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 40.64 | 18.29 | 58.93 |
| IRONWORKER, STRUCTURAL | 39.00 | 34.25 | 73.25 |
| TRUCK DRIVER: OFF ROAD TRUCK | 19.06 | — | 19.06 |
| TRUCK DRIVER: FLATBED AND LOWBOY | 23.23 | 9.89 | 33.12 |
| TRUCK DRIVER: DUMP AND TANDEM | 16.35 | — | 16.35 |
| TRUCK DRIVER: WATER TRUCK | 21.94 | 11.51 | 33.45 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | 16.40 | — | 16.40 |
| TRAFFIC CONTROL: SERVICE DRIVER | 13.96 | — | 13.96 |
| OPERATOR: STRIPING MACHINE | 27.02 | 12.14 | 39.16 |
| OPERATOR: ROTO MILL GROUNDMAN | 16.36 | — | 16.36 |
| OPERATOR: ROTO MILL | 17.86 | — | 17.86 |
| OPERATOR: TRACTOR | 14.77 | — | 14.77 |
| OPERATOR: SCREED | 14.87 | 2.64 | 17.51 |
| OPERATOR: SCRAPER | 17.88 | — | 17.88 |
| OPERATOR: ROLLER | 14.54 | 2.45 | 16.99 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 16.30 | 2.52 | 18.82 |
| OPERATOR: MECHANIC | 19.24 | — | 19.24 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | 17.24 | — | 17.24 |
| OPERATOR: LOADER | 17.37 | — | 17.37 |
| OPERATOR: GRADER/BLADE | 18.30 | — | 18.30 |
| OPERATOR: DISTRIBUTOR | 15.33 | — | 15.33 |
| OPERATOR: CRANE | 22.40 | 4.39 | 26.79 |
| OPERATOR: CONCRETE SAW | 17.80 | — | 17.80 |
| OPERATOR: CONCRETE FINISHING MACHINE | 24.26 | — | 24.26 |
| OPERATOR: BULLDOZER | 19.27 | — | 19.27 |
| OPERATOR: BROOM/SWEEPER | 14.56 | — | 14.56 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 16.28 | — | 16.28 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 19.17 | — | 19.17 |
| LABORER: PIPELAYER | 26.56 | 13.05 | 39.61 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 29.75 | 12.83 | 42.58 |
| LABORER: FLAGGER | 13.08 | — | 13.08 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | 29.21 | 14.63 | 43.84 |
| LABORER: COMMON OR GENERAL | 14.29 | — | 14.29 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 13.03 | — | 13.03 |
| IRONWORKER, REINFORCING | 15.66 | — | 15.66 |
| FORM WORKER | 14.64 | — | 14.64 |
| CEMENT MASON/CONCRETE FINISHER | 15.31 | — | 15.31 |
| CARPENTER | 15.84 | — | 15.84 |