Highway Published 05/18/2026. 32 classifications. Covers 1 county: Kootenai
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | 37.58 | 16.10 | 53.68 |
| LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | 28.48 | 13.00 | 41.48 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | 40.89 | 18.64 | 59.53 |
| TRUCK DRIVER: WATER TRUCK | 23.14 | 11.72 | 34.86 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | 23.93 | 11.27 | 35.20 |
| TRUCK DRIVER: LOWBOY TRUCK | 26.61 | 13.21 | 39.82 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 21.64 | 9.40 | 31.04 |
| TRAFFIC CONTROL: FLAGGER | 20.76 | 9.40 | 30.16 |
| OPERATOR: SCREED | 26.06 | 11.56 | 37.62 |
| OPERATOR: ROLLER (SUBGRADE) | 19.99 | 7.99 | 27.98 |
| OPERATOR: ROLLER (FINISHING) | 25.77 | 11.64 | 37.41 |
| OPERATOR: ROLLER | 25.12 | 11.76 | 36.88 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 25.78 | 11.50 | 37.28 |
| OPERATOR: OILER | 22.25 | 6.52 | 28.77 |
| OPERATOR: MECHANIC | 23.55 | 8.54 | 32.09 |
| OPERATOR: LOADER | 26.06 | 11.76 | 37.82 |
| OPERATOR: GRADER/BLADE | 26.06 | 11.64 | 37.70 |
| OPERATOR: FORKLIFT | 23.13 | 9.17 | 32.30 |
| OPERATOR: CRANE | 23.53 | 9.55 | 33.08 |
| OPERATOR: BROOM/SWEEPER | 23.34 | 8.48 | 31.82 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 25.18 | 11.55 | 36.73 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 25.88 | 11.62 | 37.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 23.07 | 10.00 | 33.07 |
| LABORER: GRADE CHECKER | 20.64 | 7.37 | 28.01 |
| LABORER: COMMON OR GENERAL | 22.86 | 9.54 | 32.40 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 23.40 | 9.72 | 33.12 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 25.47 | 9.52 | 34.99 |
| ELECTRICIAN | 26.97 | 12.10 | 39.07 |
| CARPENTER, EXCLUDES FORM WORK | 23.92 | 9.75 | 33.67 |
| CARPENTER (FORM WORK ONLY) | 26.24 | 9.48 | 35.72 |
| TRUCK DRIVER: DUMP (OVER 6 YDS) | 37.02 | 20.93 | 57.95 |
| TRUCK DRIVER: DUMP (6 YDS AND UNDER) | 36.58 | 20.93 | 57.51 |