Highway Published 05/18/2026. 30 classifications. Covers 1 county: Jefferson
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | 37.58 | 16.10 | 53.68 |
| LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | 28.48 | 13.00 | 41.48 |
| TRUCK DRIVER: WATER TRUCK | 21.35 | 13.05 | 34.40 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | 23.93 | 11.27 | 35.20 |
| TRUCK DRIVER: LOWBOY TRUCK | 26.61 | 13.21 | 39.82 |
| TRUCK DRIVER: DUMP TRUCK | 21.35 | 12.59 | 33.94 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 17.69 | 4.66 | 22.35 |
| TRAFFIC CONTROL: FLAGGER | 22.68 | 10.70 | 33.38 |
| OPERATOR: SCREED | 22.30 | 7.22 | 29.52 |
| OPERATOR: ROTOMILL | 25.42 | 10.25 | 35.67 |
| OPERATOR: ROLLER (SUBGRADE) | 19.99 | 7.99 | 27.98 |
| OPERATOR: ROLLER | 24.86 | 10.13 | 34.99 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 24.61 | 8.23 | 32.84 |
| OPERATOR: OILER | 22.25 | 6.52 | 28.77 |
| OPERATOR: MECHANIC | 25.82 | 9.75 | 35.57 |
| OPERATOR: LOADER | 24.94 | 8.95 | 33.89 |
| OPERATOR: GRADER/BLADE | 25.85 | 9.60 | 35.45 |
| OPERATOR: FORKLIFT | 23.13 | 9.17 | 32.30 |
| OPERATOR: CRANE | 23.34 | 9.45 | 32.79 |
| OPERATOR: BROOM/SWEEPER | 24.10 | 8.66 | 32.76 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 21.15 | 8.20 | 29.35 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 22.34 | 10.90 | 33.24 |
| LABORER: GRADE CHECKER | 20.64 | 7.37 | 28.01 |
| LABORER: COMMON OR GENERAL | 23.19 | 11.00 | 34.19 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 19.38 | 7.86 | 27.24 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 25.47 | 9.52 | 34.99 |
| ELECTRICIAN | 26.33 | 11.45 | 37.78 |
| CEMENT MASON/CONCRETE FINISHER | 22.90 | 11.99 | 34.89 |
| CARPENTER, EXCLUDES FORM WORK | 25.21 | 9.32 | 34.53 |
| CARPENTER (FORM WORK ONLY) | 26.24 | 9.48 | 35.72 |