Heavy Published 05/18/2026. 26 classifications. Covers 1 county: Shoshone
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | 38.87 | 17.84 | 56.71 |
| ELECTRICIAN | 49.55 | 19.09 | 68.64 |
| POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | 30.41 | 15.95 | 46.36 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | 29.31 | 15.95 | 45.26 |
| POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | 29.04 | 15.95 | 44.99 |
| POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | 28.76 | 15.95 | 44.71 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES) (A): 180'-250': $.50 OVER SCALE (B): OVER 250' $.80 OVER SCALE | 28.60 | 15.95 | 44.55 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | 28.44 | 15.95 | 44.39 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER $2.00 | 27.51 | 15.95 | 43.46 |
| IRONWORKER: REINFORCING AND STRUCTURAL | 43.40 | 30.27 | 73.67 |
| LABORER (PIPELINE ONLY): COMMON | 26.28 | 12.15 | 38.43 |
| AND OVER FROM THE MAIN POST OFFICE | 25.84 | 13.00 | 38.84 |
| LABORER: GROUP 4 ASPHALT INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | 28.48 | 13.00 | 41.48 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | 40.89 | 18.64 | 59.53 |
| PLUMBER (ZONE 1) | 37.71 | 23.44 | 61.15 |
| TRUCK DRIVER: WATER TRUCK | 24.48 | 11.67 | 36.15 |
| TRUCK DRIVER: LOWBOY TRUCK | 21.00 | 12.10 | 33.10 |
| OPERATOR: CONCRETE BATCH PLANT | 24.94 | 11.96 | 36.90 |
| OPERATOR: FORKLIFT | 21.20 | — | 21.20 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 20.97 | — | 20.97 |
| LABORER: PIPELAYER | 17.67 | 7.26 | 24.93 |
| LABORER: LANDSCAPE | 22.13 | 11.13 | 33.26 |
| LABORER: COMMON OR GENERAL | 24.66 | 8.36 | 33.02 |
| CARPENTER, EXCLUDES FORM WORK | 29.92 | 5.20 | 35.12 |
| TRUCK DRIVER: DUMP (OVER 6 YDS) | 37.02 | 20.93 | 57.95 |
| TRUCK DRIVER: DUMP (6 YDS AND UNDER) | 36.58 | 20.93 | 57.51 |