Building Published 05/18/2026. 29 classifications. Covers 1 county: Linn
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 36.06 | 24.35 | 60.41 |
| BOILERMAKER | 48.48 | 33.91 | 82.39 |
| BRICKLAYER | 36.00 | 17.79 | 53.79 |
| TILE SETTER | 36.00 | 17.79 | 53.79 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | 31.17 | 24.15 | 55.32 |
| MILLWRIGHT | 36.70 | 28.95 | 65.65 |
| ELEVATOR MECHANIC FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | 56.30 | 38.44 | 94.74 |
| POWER EQUIPMENT OPERATOR: PAVER(ALL TYPES), ROLLER | 35.29 | 18.35 | 53.64 |
| POWER EQUIPMENT OPERATOR: LOADER | 37.62 | 18.35 | 55.97 |
| POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE | 39.00 | 18.35 | 57.35 |
| IRONWORKER: STRUCTURAL | 35.53 | 24.45 | 59.98 |
| IRONWORKER: ORNAMENTAL | 35.53 | 24.45 | 59.98 |
| IRONWORKER: REINFORCING | 37.50 | 30.99 | 68.49 |
| LABORER (COMMON OR GENERAL) | 28.33 | 19.82 | 48.15 |
| LABORER: PIPELAYER | 28.33 | 19.82 | 48.15 |
| PAINTER: SPRAY | 29.55 | 12.10 | 41.65 |
| PAINTER (BRUSH AND ROLLER) | 29.55 | 12.10 | 41.65 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | 45.51 | 21.57 | 67.08 |
| PLUMBER | 45.51 | 21.57 | 67.08 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 45.99 | 26.42 | 72.41 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND UNIT INSTALLATION) | 41.45 | 23.11 | 64.56 |
| ROOFER | 21.92 | 5.07 | 26.99 |
| OPERATOR: FORKLIFT | 22.96 | 7.49 | 30.45 |
| OPERATOR: CRANE | 24.15 | 8.10 | 32.25 |
| OPERATOR: BULLDOZER | 26.13 | 13.56 | 39.69 |
| LABORER: MASON TENDER - BRICK | 19.39 | 8.17 | 27.56 |
| FLOOR LAYER: FLOOR COATING/EPOXY | 22.43 | — | 22.43 |
| ELECTRICIAN | 28.85 | 10.43 | 39.28 |
| CEMENT MASON/CONCRETE FINISHER | 21.66 | 2.47 | 24.13 |